Orange County NC Website
Approved 7/8/2013 <br />OC Board of Adjustment – 6/10/2013 Page 42 of 92 <br />SECTION 5.10.8 (B) – GENERAL SUBMITTAL REQUIREMENTS – SPECIAL USE PERMITS – 1 <br />CONTINUED ("Yes" indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance <br />Requirements <br />PLANNING <br />STAFF <br />RECOMMENDED <br />FINDINGS <br /> <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />BOA <br />FINDINGS <br />5.8.10 (B) (3) (o) <br /> <br />All applications shall <br />contain a demonstration <br />that the wireless support <br />structure is sited so as to <br />have the least visually <br />intrusive effect reasonably <br />possible and thereby have <br />the least adverse visual <br />effect on the environment <br />and its character, on <br />existing vegetation, and <br />on the residences in the <br />area of the <br />telecommunications <br />tower. <br /> <br /> X Yes ___No Tab(s) 3 and 7 of the <br />application booklet <br />contains the required <br />information. <br /> <br /> <br /> _x_Yes ___No <br />5.8.10 (B) (3) (p) <br /> <br />A statement, prepared by <br />a professional engineer <br />licensed in the State of <br />North Carolina, which <br />through rational <br />engineering analysis, <br />certifies the tower's <br />compliance with <br />applicable standards as <br />set forth in the State of <br />North Carolina Building <br />Code, and any associated <br />regulations; and describes <br />the tower's capacity, <br />including an example of <br />the number and type of <br />antennas it can <br />accommodate. <br /> X Yes ___No Tab(s) 3 and 30 of the <br />application booklet <br />contains the required <br />information. <br /> <br />Tab 30 contains a <br />statement authored by <br />Margaret Robinson of <br />American Tower <br /> _x_Yes ___No <br />3