Browse
Search
BOA minutes 061013
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2013
>
BOA minutes 061013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:17:58 AM
Creation date
3/7/2018 10:37:13 AM
Metadata
Fields
Template:
BOCC
Date
6/10/2013
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 061013
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 7/8/2013 <br />OC Board of Adjustment – 6/10/2013 Page 26 of 92 <br />SECTION 5.10.8 (A) – STANDARDS FOR TELECOMMUNICATION FACILITIES 1 <br />("Yes" indicates compliance; "No" indicates non-compliance) 2 <br />Ordinance <br />Requirements <br />PLANNING <br />STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />BOA <br /> FINDINGS <br />5.10.8 (A) (1) (f) <br />A statement stating how <br />the proposed tower will <br />minimize visual <br />intrusiveness to <br />surrounding properties in <br />the area. Criteria that may <br />be used for such evidence <br />may be height and type of <br />existing trees surrounding <br />the proposed tower, and <br />local topography. <br /> <br /> X Yes ___No Tab(s) 3 and 7 of the <br />application booklet <br />contains the required <br />information. <br /> _x_Yes ____No <br />5.10.8 (A) (1) (g) <br />A copy of the installed <br />foundation design <br />including a geotechnical <br />sub-surface soils <br />investigation, evaluation <br />report, and foundation <br />recommendation for the <br />proposed wireless support <br />structure. <br /> <br /> X Yes ___No Tab(s) 3 and 41 of the <br />application booklet <br />contain required <br />information. A final <br />geotech report is <br />required prior to the <br />issuance of a building <br />permit. <br /> <br />Staff will recommend this <br />become a condition of <br />approval. <br /> _x_Yes ____No <br />5.10.8 (A) (1) (h) <br />The existing cell sites <br />(latitude, longitude, power <br />levels) to which this <br />proposed site will be a <br />handoff candidate. <br /> <br /> X Yes ___No Tab(s) 15 and 21 of the <br />application booklet <br />contains the required <br />information. <br /> _x_Yes ____No <br />5.10.8 (A) (1) (i) <br />Propagation studies of the <br />proposed site and <br />showing all adjoining <br />planned, proposed, in- <br />service or existing sites. <br />This will include all of the <br />modeling information used <br />to produce the study <br />including, but not limited <br />to, any assumptions made <br />about ambient tree height. <br /> X Yes ___No Tab(s) 17 and 20 of the <br />application booklet <br />contains the required <br />information. <br /> _x_Yes ____No <br />3
The URL can be used to link to this page
Your browser does not support the video tag.