Orange County NC Website
Approved 12/8/2014 <br /> <br />OC Board of Adjustment – 10/13/2014 Page 14 of 17 <br /> <br /> <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />SPECIFIC STANDARDS <br />Waste Disposal <br />Method and adequacy of provision for <br />sewage disposal facilities, solid waste <br />and water service. <br />5.3.2(B)(1) Staff’s abstract – Attachment 3 <br />Both Environmental Health and Solid <br />Waste have indicated they have no <br />concerns. <br />Conditions are recommended to <br />require Health Permit and Solid Waste <br />Permit as part of development <br />process. <br /> <br />Safety <br />Method and adequacy of police, fire <br />and rescue squad protection. <br />5.3.2(B)(2) Staff’s abstract – Attachment 3 <br />Conditions are recommended <br />requiring fire marshal to review and <br />approve building plans as part of <br />development process. <br /> <br /> <br /> <br /> <br /> <br /> <br />Vehicle Access <br />Method and adequacy of vehicle <br />access to the site and traffic conditions <br />around the site. <br />5.3.2(B)(3) The submitted site plan shows access <br />points. <br /> <br />There will not be an appreciable traffic <br />increase in the area associated with <br />the development of the retreat <br />center. <br /> <br /> 1 2 <br />MOTION made by David Blankfard to find in the affirmative the specific standards for UDO Section 5.3.2 (b) 1, (b) 2 3 <br />an (b) 3 based on the findings of fact by staff’s abstract in Attachment 3 and the submitted site plan. 4 <br />Karen Barrows seconded. 5 <br />VOTE: Unanimous 6 <br /> 7 <br /> 8