Browse
Search
BOA minutes 082714
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2014
>
BOA minutes 082714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:16:22 AM
Creation date
3/7/2018 10:31:18 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2014
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 082714
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROVED 10/13/2014 <br />OC Board of Adjustment – 8/27/2014 Page 7 of 64 <br /> <br /> <br />the abstract, Mr. Harvey, feel free to correct me if I’m wrong, staff has indicated that it is compliance with 1 <br />the Comprehensive Plan and the other development ordinances so we would submit that has already 2 <br />been established. That being said, with me today, I have Rob Priester with PSNC Energy. Rob is a Civil 3 <br />Engineering, received a Civil Engineering degree from Clemson University. He is a licensed professional 4 <br />engineer. He has been an engineer on gas pipeline work for about 7 years doing pipeline design and 5 <br />engineering and project management. Also, with me tonight is Andrew Moore, in the blue shirt over 6 <br />here. Andrew received his Civil Engineering from NC State. He has been a licensed professional 7 <br />engineer since 2000. He has had 19 years of progressive pipeline experience with Piedmont Natural 8 <br />Gas, North Carolina Natural Gas and PSNC Energy including pipeline design and engineering, pipeline 9 <br />integrity management, regulatory compliance among other things. We would tender both of these 10 <br />witnesses as experts in pipeline design, construction, operation and safety. I don’t know if that is 11 <br />something you guys typically rule on if it is tendered. 12 <br />James Bryan: Not unless there is an objection. 13 <br />Matthew Rhoads:Very briefly and I think I am also cognoscente of the fact of how many people are going 14 <br />to speak here tonight, the summary of the project; this is a 16 mile long 16 inch natural gas pipeline that 15 <br />is going from Graham in Alamance County to Carrboro and Orange County. The entire length of that is 16 <br />parallel in existing 10 inch natural gas pipeline. It is within, I believe, about 10 feet of that existing line for 17 <br />the most part. There are a couple of places where we had to jog around for different reasons. The vast 18 <br />majority of it is in existing right of way that PSNC has already acquired in the 1950s for that 10 inch 19 <br />pipeline but it specifically grants the right to install an additional pipeline with some additional payment 20 <br />which we will make as required by the easements. For about half of the length of the project in Orange 21 <br />County, it is also paralleling a 24 inch natural gas pipeline that owned by Cardinal Pipeline Company, 22 <br />something along those line so for about half the project, there is already an existing 24 inch pipeline and 23 <br />existing 10 inch pipeline and then this would be the third pipeline right beside there and Cardinal has its 24 <br />own easement that is separate and apart from PSNC’s. Again, primarily, this is all being installed with an 25 <br />existing right of way and we are complying with those easement requirements. At this time, I would call 26 <br />Rob Priester to give some additional evidence. I believe, Mr. Priester, you have already been sworn? 27 <br />Rob Priester: I have been sworn. I am Robert Priester with Scana and PSNC Energy. 28 <br />Matt Rhoads: And if you would just state your address. Your work address 29 <br />Rob Priester: It’s 100 Scana Parkway, Casey, South Carolina 27033. 30 <br />Matt Rhoads: And what has your role been with the project? 31 <br />Rob Priester: I am the project manager. We have outside consultants that I am overseeing. 32 <br />Matt Rhoads: And did you help prepare the application in this matter? 33 <br />Rob Priester: Yes. 34 <br />Matt Rhoads: And everything in the application true and accurate to your knowledge? 35 <br />Rob Priester: Yes. 36 <br />Matt Rhoads: And is it your understanding that staff believes the application to be complete? 37 <br />Rob Priester: Yes. 38 <br />Matt Rhoads: And PSNC has submitted the plans and documents required by Sections 5.32 and 5.95 39 <br />and of the Unified Development Ordinance? Is that correct? 40 <br />Rob Priester: Yes. 41
The URL can be used to link to this page
Your browser does not support the video tag.