Orange County NC Website
APPROVED 10/13/2014 <br />OC Board of Adjustment – 8/27/2014 Page 52 of 64 <br /> <br /> <br />Such notice shall be <br />published in a newspaper of <br />general circulation in <br />Orange County once a week <br />for two successive weeks, <br />with the first notice to be <br />published not less than ten <br />days not more than we days <br />prior to the date of the <br />hearing. <br />public hearing was <br />published in the News of <br />Orange and the Chapel <br />Hill Herald consistent with <br />the requirements of the <br />UDO. <br /> <br />2.7.5 (c) <br /> <br />The Planning Director shall <br />post on the affected <br />property a notice of the <br />public hearing at least ten <br />days prior to the date of said <br />hearing. <br /> _X Yes <br /> <br />____No <br /> <br /> Attachment 3 of the <br />abstract package as <br />produced by staff provides <br />the necessary detail <br />outlining compliance with <br />this requirement. <br /> <br /> ___Yes <br /> <br />____No <br /> <br />2.7.5 (d) <br /> <br />Written notice shall be sent <br />by certified mail to all <br />adjacent property owners <br />not less than 15 days before <br />the hearing date. Adjacent <br />property owners are those <br />whose property lies within <br />five hundred feet of the <br />affected property and whose <br />manes and addresses are <br />currently listed in the <br />Orange County tax records. <br /> _X Yes <br /> <br />____No <br /> <br /> Attachment 3 of the <br />abstract package as <br />produced by staff provides <br />the necessary detail <br />outlining compliance with <br />this requirement. <br /> <br /> ___Yes <br /> <br />____No <br /> <br /> <br /> 1 <br />MOTION by Jeff Schmitt of agreement with staff’s recommendations from 2.7.5 a through d. Seconded 2 <br />by David Blankfard. 3 <br />VOTE Unanimous 4 <br />Larry Wright: Ok so we have now Section 5.9.5 Standards for Electric, Gas, and Liquid Fuel 5 <br />Transmission Lines and this is on pages 276 and 277. Ordinance requirements 1.a through e and 2.a 6 <br />through c. 7 <br /> 8 <br />SECTION 5.9.5 – STANDARDS FOR ELECTRIC, GAS, AND LIQUID FUEL TRANSMISSION LINES 9 <br />("Yes" indicates compliance; "No" indicates non-compliance) 10 <br />Ordinance <br />Requirements <br />PLANNING <br />STAFF <br />RECOMMENDED <br />FINDINGS <br />EVIDENCE SUBMITTED <br />TO SUPPORT <br />FINDINGS <br />BOA <br /> FINDINGS <br /> <br />(1) Submittal <br />Requirements: In addition <br />to the information required <br />by Section 2.7, the <br />following shall be submitted <br />as part of the application: <br />(a) A site plan showing <br />the following <br /> _X Yes <br /> <br />____No <br /> <br /> Attachment 2 contains <br />the application package <br />and site plan. <br />Sheet(s) 2 through 3 and <br />37 through 46 of the site <br />plan contains a project <br />description and the <br />construction sequence, <br />erosion/sedimentation <br />control management, <br /> ___Yes <br /> <br />____No <br />