Browse
Search
BOA minutes 082714
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2014
>
BOA minutes 082714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:16:22 AM
Creation date
3/7/2018 10:31:18 AM
Metadata
Fields
Template:
BOCC
Date
8/27/2014
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 082714
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROVED 10/13/2014 <br />OC Board of Adjustment – 8/27/2014 Page 16 of 64 <br /> <br /> <br />Mark Micol: You have specifications on the Cardinal pipeline 24 inch as far as depth and age in your 1 <br />information on the Cardinal. 2 <br />Rob Priester: Depth of cover, I don’t have any age, it was put in 1999 but we are working with the 3 <br />Cardinal Pipeline as part of this project to makes sure we have all our bases covered with them. 4 <br />Mark Micol: Mr. Harvey was an SUP required in 99 for that pipeline? 5 <br />Michael Harvey: We have no record of one, sir. 6 <br />Mark Micol: How about other projects that PSNC has done in the County, have they been required to 7 <br />have an SUP? 8 <br />Michael Harvey: PSNC recently did a project expanding an existing pipeline from the regulator station in 9 <br />Carrboro where this line will terminate along North Highway 86 through Eubanks, Millhouse, Mt. Sinai 10 <br />Road toward Durham County. That pipeline was located primarily and solely within North Carolina 11 <br />Department of Transportation right of way as such we did not require the special use permit because we 12 <br />don’t regulate development within the right of way. 13 <br />Jeff Schmitt: When you were talking a few minutes ago about testing, there was a comment you made 14 <br />about wells in the field. You said something about wells in the field. What does that mean? 15 <br />Rob Priester: When the pipeline is shipped, it is going to be shipped in roughly 60 foot joints, sticks of 16 <br />pipe. You weld each of those pieces together with qualified welders. 17 <br />Jeff Schmitt: Welds. 18 <br />Matt Rhoads: He has the South Carolina draw, not the North Carolina. 19 <br />Jeff Schmitt: I am sure a lot of the testimony we will hear from folks will relate to the safety issues about 20 <br />this. Could you sort of speak about the safety record of PSNC across North Carolina, across South 21 <br />Carolina where you have existing facilities? In general, you don’t need to give specific instances, but 22 <br />what is your record, how does it compare to other people. Piedmont Natural Gas? 23 <br />Andrew Moore: I would say PSNC’s safety record is as good as or better than any other pipeline 24 <br />operator. 25 <br />Jeff Schmitt: Have you ever been cited by the Public Service Commission of North Carolina for any 26 <br />violations for safety? 27 <br />Andrew Moore: Safety violations, no. 28 <br />Jeff Schmitt: None. 29 <br />Andrew Moore: None that I am aware of. 30 <br />Jeff Schmitt: The pipe is being built to provide for future demand, I would presume. How do you go 31 <br />about forecasting the demand in a market like this for additional gas? What is the basis? 32 <br />Matt Rhoads: Just to clarify I think he said it was existing demand because that existing 10 inch is at 33 <br />capacity but that it is going to be a 16 inch to cover the existing demand that needs more gas right now 34 <br />but also projected in the future is why it is need now for existing demand but I think they are designing it 35 <br />to also encompass future demand. 36 <br />Jeff Schmitt: Existing demand means there is an inventory of either new or will built commercial or 37 <br />residential facilities where natural gas is going to be used to service the area, is that right. 38
The URL can be used to link to this page
Your browser does not support the video tag.