Browse
Search
BOA minutes 060815
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2015
>
BOA minutes 060815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 9:15:29 AM
Creation date
3/7/2018 10:22:38 AM
Metadata
Fields
Template:
BOCC
Date
6/8/2015
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
BOA agenda 060815
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Agendas\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OC Board of Adjustment – 6/8/2015 Page 61 of 68 <br /> <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities (continued) <br /> <br />Landscape and Buffers – Type C <br />land use buffer <br /> <br />5.10.8 (B) <br />(4) (e) <br /> <br />Application, Site plan, Applicant <br />Testimony. <br />Yes <br /> <br />Visibility of balloon shall not <br />constitute sole justification of denial <br />but shall serve as an indication of <br />what location on the site may be <br />less visually intrusive. <br />5.10.8 (B) <br />(4) (f) <br />Applicant testimony <br />(acknowledgement of condition) <br /> <br />Application (TAB 22) <br />Yes <br /> <br />The applicant shall demonstrate <br />and provide a description in writing <br />and by drawing how it shall <br />effectively screen from view the <br />base and all related equipment and <br />structures of the proposed facility. <br />5.10.8 (B) <br />(4) (g) <br />Site plan, Applicant Testimony Yes <br /> <br />The site plan shall indicate a <br />location for at least two equipment <br />buildings in addition to that <br />proposed for use by the applicant. <br />5.10.8 (B) <br />(4) (h) <br />Site plan Yes <br /> <br />All utilities at a facility site shall be <br />installed underground and in <br />compliance with all Laws, <br />ordinances, rules and regulations <br />of the County. <br />5.10.8 (B) <br />(4) (i) <br />Site plan, Applicant Testimony Yes <br /> <br />All wireless support structures shall <br />satisfy all applicable public safety, <br />land use, or zoning issues required <br />in this Ordinance. <br />5.10.8 (B) <br />(4) (j) <br />Application inclusive, Site plan Yes <br />Fences and Walls 5.10.8 (B) <br />(4) (k) <br />Site plan. Yes <br /> <br />Tower is structurally designed to <br />support additional users. <br />5.10.8 (B) <br />(4) (l) <br />Application inclusive Yes <br /> <br />To minimize the number of antenna <br />arrays the County may require the <br />use of dual mode antennas. <br />5.10.8 (B) <br />(4) (m) <br />Not applicable for this project N/A
The URL can be used to link to this page
Your browser does not support the video tag.