Orange County NC Website
<br />OC Board of Adjustment – 6/8/2015 Page 57 of 68 <br /> <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities (continued) <br /> <br />The make, model and <br />manufacturer of the tower and <br />antenna(s), antenna heights and <br />power levels of proposed site. <br /> 5.10.8 (A) <br />(1) (l) <br />Application (TAB 12), Applicant <br />Testimony <br />Yes <br /> <br />The frequency, modulation and <br />class of service of radio or other <br />transmitting equipment. <br /> 5.10.8 (A) <br />(1) (m) <br />Application (TAB 13), Applicant <br />Testimony <br />Yes <br /> <br />The maximum transmission power <br />capability of all radios, as designed, <br />if the applicant is a cellular facility. <br /> 5.10.8 (A) <br />(1) (n) <br />Application (TAB 14), Applicant <br />Testimony <br />Yes <br /> <br />The actual intended transmission <br />and the maximum effective <br />radiated power of the antenna(s). <br /> 5.10.8 (A) <br />(1) (o) <br />Application (TAB 15), Applicant <br />Testimony <br />Yes <br /> <br />The direction(s) of maximum lobes <br />and associated radiation of the <br />antenna(s). <br /> 5.10.8 (A) <br />(1) (p) <br />Application (TAB 16), Applicant <br />Testimony <br />Yes <br /> <br />Certification that the NIER levels at <br />the proposed site are within the <br />threshold levels adopted by the <br />FCC. <br /> 5.10.8 (A) <br />(1) (q) <br />Application (TAB 17), Applicant <br />Testimony <br />Yes <br /> <br />Certification that the proposed <br />antenna(s) will not cause <br />interference with other <br />telecommunications devices. <br /> 5.10.8 (A) <br />(1) (r) <br />Application (TAB 18), Applicant <br />Testimony <br />Yes <br /> <br />A written affidavit stating why "the <br />proposed site is necessary for their <br />communications service". <br /> 5.10.8 (A) <br />(1) (s) <br />Application (TAB(s) 19 and 26), <br />Applicant Testimony <br />Yes <br /> <br />A copy of the FCC license <br />applicable for the intended use of <br />the facility as well as a copy of the <br />5 and 10 year building out plan <br />required by the FCC. <br /> 5.10.8 (A) <br />(1) (t) <br />Application (TAB 20), Applicant <br />Testimony <br />Yes