Orange County NC Website
<br />OC Board of Adjustment – 6/8/2015 Page 52 of 68 <br /> <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />APPLICATION COMPONENTS <br />Proper forms 2.2 Application (TAB 1 of binder) Yes <br />Fees paid 2.2.4(D) Staff Testimony/Application (TAB 2 <br />of binder) <br /> <br />Yes <br /> <br />Full description of use <br /> Location <br /> Appearance <br /> Operational characteristics <br />2.7.3(B)(1) Application (Application Binder and <br />Site plan) <br /> <br />Yes <br /> <br />Owner Information 2.7.3(B)(2) Application (TAB 3 of binder and <br />Site plan) <br />Yes <br />Information needed for Use <br />Standards <br />2.7.3(B)(3) Application (TAB(s) 3, 4,5 of binder <br />and Site Plan) <br /> <br />Yes <br /> <br />Site Plans <br />(10 copies for Class B; 26 for Class <br />A) <br />2.7.3(B)(4) Application/Staff Testimony (Site <br />plan) <br /> <br />Yes <br /> <br />Preliminary Subdivision Plat (if <br />necessary) <br />2.7.3(B)(5) [No subdivision proposed.] N/A <br />List of parcels within 1,000 feet 2.7.3(B)(6) Application (TAB 5 of binder) Yes <br />Elevations of all structures 2.7.3(B)(7) Application (Site plan) Yes <br />Environmental Assessment (or <br />EIS) <br /> Topography <br /> Drainage issues <br /> Natural or Cultural <br />resources <br /> Mining <br /> Hazardous Wastes <br /> Wastewater treatment <br /> Water usage <br />2.7.3(B)(8) Project exempt per Section(s) <br />6.16.2 and 6.16.3 of UDO <br /> <br />Proposed level of land disturbance <br />for project does not meet <br />established thresholds for an <br />environmental assessment to be <br />completed. <br />N/A <br />Method of Debris Disposal 2.7.3(B)(9) Application (Site plan) Yes <br />Development Schedule 2.7.3(B)(10) Application (Site plan) Yes <br />Extended Vesting Request 2.7.3(B)(11) Not requested N/A