Orange County NC Website
<br />OC Board of Adjustment – 6/8/2015 Page 17 of 68 <br />support structure or the existing wireless telecommunications structure cannot be ea sily modified. These are all “ors” 1 <br />so the applicant has to demonstrate we can’t meet one of these standards, it’s not “and”. It’s not all five that have to be 2 <br />met by our current ordinance. I believe some of the ambiguity some of you have expressed conce rn about with the 3 <br />iteration of state statute is covered under our existing code. 4 <br /> 5 <br />Tom Johnson: We would agree with Mr. Harvey because that is exactly our point. The part about it not meeting the 6 <br />objectives and not being technically sufficient at that site to meet the objectives of Mr. Kerlin has testified is our point. 7 <br />That is one of those “ors” and that is the “or” we are focusing on because that is a key point here. 8 <br /> 9 <br />Bob Hornik: The co-location possibility on the existing Kerley Road tower does improve coverage in the area, right? 10 <br /> 11 <br />Lee Kerlin: Certainly. 12 <br /> 13 <br />Bob Hornik: It just doesn’t meet your standard for what you want to provide. 14 <br /> 15 <br />Tom Johnson: Please say what it does for you in terms of connecting with your existing towers. 16 <br /> 17 <br />Lee Kerlin: The proposal we have before you provides a lot of coverage out into the county to the northwest. We 18 <br />expect connectivity to our network to the northeast of Erwin Road. We expect connectivity to the south and we also 19 <br />provide more coverage into the neighborhoods to the southeast which is part of the objective. 20 <br /> 21 <br />Bob Hornik: You are saying the American Tower site would not do that? 22 <br /> 23 <br />Lee Kerlin: It does not meet those objectives. 24 <br /> 25 <br />Bob Hornik: The potential co-location at the Kerley Road meets all the same objectives but it just doesn’t go quite as 26 <br />far, right, looking at the propagation map? 27 <br /> 28 <br />Lee Kerlin: It doesn’t meet them at the signal strength that we need to provide. 29 <br /> 30 <br />Bob Hornik: It covers almost the same area or territory but the dark green coverage is less, right? 31 <br /> 32 <br />Lee Kerlin: Yes, the total coverage is smaller. 33 <br /> 34 <br />Bob Hornik: Is the minus 90 dbm, do you drop calls at minus 90? 35 <br /> 36 <br />Lee Kerlin: It depends. You can’t say that at 90 you drop calls, quality is important as well as sign al strength. 37 <br /> 38 <br />Bob Hornik: So on your propagation maps, white is no coverage? 39 <br /> 40 <br />Lee Kerlin: Yes, that is off network for us when you consider various signal strength. I’m not saying you could never 41 <br />reach a tower from that and don’t forget this is a two way street, your handset also has to communicate back to the 42 <br />tower otherwise we would just make an FM broadcast tower and cover everywhere. 43 <br /> 44 <br />Bob Hornik: And negative 104 is kind of pale green? 45 <br /> 46 <br />Lee Kerlin: Yes. 47 <br /> 48 <br />Bob Hornik: And that is coverage, right? 49 <br /> 50