Orange County NC Website
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />Approved 3113117 <br />John Price: Is that important to you in accessing the impact? <br />David Smith: No. <br />John Price: That's not important to you? <br />David Smith: No. As long as it's screened by trees or a buffer. <br />John Price: As long as it's... Repeat that please. <br />David Smith: As long as there's some screen from the trees or from a buffer, I don't think it <br />impacts the property values. <br />John Price: Well if there are mature trees and you made a note that it's completely surrounded by <br />mature trees, aren't you saying because of that there's less impact? <br />David Smith: I'm describing the property. <br />John Price: You also note in the report that the area between the least area and the tower site are <br />heavily wooded. <br />David Smith: Yes. <br />John Price: You also make the statement in your report, "If the trees are removed a 40 -foot wide <br />landscape buffer would be installed. ". <br />David Smith: Yes. <br />John Price: Were you aware at the time you prepared your analysis that the Butner family that <br />owns the property on which the cell tower was going to be constructed was going to be <br />considering timbering this property? <br />David Smith: No. <br />John Price: No one advised you of that with Towercom? <br />David Smith: No. <br />OC Board of Adjustment —12/12/16 <br />Page 27 of 156 <br />