Orange County NC Website
Approved 12/12/16 <br />OC Board of Adjustment – 10/10/16 Page 29 of 113 <br /> <br /> <br />LeAnne Brown: Are you aware of whether there was an application made to Orange County for wastewater 1 <br />and well? 2 <br /> 3 <br />Michael Harvey: I am aware. 4 <br /> 5 <br />LeAnne Brown: Do you happen to have copies of those materials? 6 <br /> 7 <br />Michael Harvey: Yes. 8 <br /> 9 <br />LeAnne Harvey: Let’s mark it as number 12. Looking at Exhibit 12 can you identify the number of guests 10 <br />and staff that are represented to Orange County as utilizing this facility? Maybe look at wastewater instead 11 <br />of well. 12 <br /> 13 <br />Michael Harvey: It is not readily apparent in what I’m reading. Are you talking about the application for 14 <br />permit received on the 17th of March 2016? 15 <br /> 16 <br />LeAnne Brown: Yes, that’s right. How many guests and staff members does it anticipate? 17 <br /> 18 <br />Michael Harvey: Friday and Saturday the number of employees, 10 max. A number of 250 guests for a 19 <br />farm building constructed for bona fide farm purposes including but not limited to the storage and 20 <br />processing of agricultural products, equipment, agritourism, such as educational workshops, school field 21 <br />trips, weddings, retreats, and farm dinners. 22 <br /> 23 <br />LeAnne Brown: So we have 10 staff members and 250 guests on the application for wastewater permit. Is 24 <br />that correct? 25 <br /> 26 <br />Michael Harvey: Correct. 27 <br /> 28 <br />LeAnne Brown: And it identified three events per week, is that correct? 29 <br /> 30 <br />Michael Harvey: I don’t see where it says three events per week, it says Friday and Saturday number of 31 <br />employees and I just alluded to you, 10 max and number of guests, 250. Monday through Thursday the 32 <br />number of employees is 5 max, number of guests is zero. 33 <br /> 34 <br />LeAnne Brown: Can you look at those materials and tell the size of the design square footage? Do you 35 <br />have the letters passed back and forth in that file? 36 <br /> 37 <br />Michael Harvey: The information provided to me by the health department; I have a February 19th letter. 38 <br />Based on the design flow of 2,750 gallons per day was assigned in accordance with applicable sewage 39 <br />treatment system regulations per the state. 40 <br /> 41 <br />LeAnne Brown: Do you have a letter requiring 82,000 square foot? 42 <br /> 43 <br />Michael Harvey: Yes, that’s the next line. Design flow of 2,750 gallons per day when need approximately 44 <br />82, 500 square feet of suitable soil area. 45 <br /> 46 <br />LeAnne Brown: Is that about 1.89 acres? 47 <br /> 48 <br />Michael Harvey: Approximately, yes. 49