Browse
Search
BOA minutes 011116
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2016
>
BOA minutes 011116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:54:53 PM
Creation date
3/6/2018 4:52:38 PM
Metadata
Fields
Template:
BOCC
Date
1/11/2016
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> <br />OC Board of Adjustment – 11/9/15 Page 18 of 66 <br /> <br /> 1 <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities (continued) <br /> <br />Applications for the co-location of <br />antennas <br /> <br />5.8.10 (A) <br />(2) <br /> <br />Staff is recommending a finding that <br />this provision is not applicable as <br />the proposal does not involve the <br />co-location of an antenna. <br /> <br />N/A N/A <br />Overall Policy and Desired Goals <br /> <br />Alternatives to constructing new <br />wireless support structures, <br />placement to minimize adverse <br />aesthetic impacts, etc. <br /> <br /> <br />5.8.10 (B) <br />(1) (a) and <br />(b) <br /> <br />Application (Attachment 2) <br /> <br />As proposed the modification will <br />ensure the continued operation of <br />the existing telecommunication <br />facility. <br /> <br />This could help to potentially <br />minimize the need for additional <br />facilities in the area as this facility <br />will be allowed to continue operation <br />with a relocated driveway. <br /> <br />Yes Yes <br />Balloon Test <br /> <br />5.8.10 (B) <br />(2) <br /> <br />Staff is recommending a finding that <br />this provision is not applicable as <br />the proposal does not involve the <br />erection of a new <br />telecommunication tower requiring <br />the holding of a balloon test. <br /> <br />This section requires a balloon test <br />for ‘proposed new wireless facilities’. <br />As no new wireless facilities were <br />proposed a balloon test was not <br />required. <br /> <br />The required neighborhood meeting, <br />however, was held on November <br />30, 2015. Please refer to <br />Attachment 3 for more information. <br /> <br />N/A N/A <br />Submittal of site plan 5.8.10 (B) <br />(3) (a) <br /> <br />Application (Attachment 2), Site <br />plan, Applicant Testimony, Staff <br />testimony. Site plan denotes the <br />location of the new driveway. <br /> <br />Yes Yes <br /> <br />Plans and elevations for all <br />proposed structures and <br />descriptions of the color and nature <br />of all exterior material, along with <br />the make, model, and manufacturer <br />of the proposed structure, <br />maximum antenna heights, and <br />power levels. <br /> <br />5.8.10 (B) <br />(3) (b) <br /> <br />Original Special Use Permit <br />Application file and recorded Special <br />Use Permit allowing for the erection <br />of the approved tower. This <br />information can be found on page(s) <br />200 through 240 of the <br />supplemental information supplied <br />to the Board. <br /> <br />The original application file for the <br />Yes Yes
The URL can be used to link to this page
Your browser does not support the video tag.