Browse
Search
BOA minutes 011116
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Minutes
>
2016
>
BOA minutes 011116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:54:53 PM
Creation date
3/6/2018 4:52:38 PM
Metadata
Fields
Template:
BOCC
Date
1/11/2016
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> <br />OC Board of Adjustment – 11/9/15 Page 16 of 66 <br /> <br />compliance with applicable <br />State building code dated <br />August 9, 2010, and <br />3. A Structural Analysis Report <br />completed by FDH <br />Engineering Inc., sealed by <br />Christopher Ply, describing <br />the tower’s capacity and <br />structural integrity as well as <br />compliance with applicable <br />State building code dated <br />April 30, 2014. <br /> <br />This information is contained <br />throughout all identified documents. <br />There is also specific detail(s) <br />referenced on page(s) 323-341 of <br />the supplemental package. <br /> <br /> <br />Certification that the NIER levels at <br />the proposed site are within the <br />threshold levels adopted by the <br />FCC. <br /> <br />5.10.8 (A) <br />(1) (q) <br /> <br />Staff is recommending a finding that <br />this provision is not applicable as <br />the relocation of the driveway, as <br />proposed, will not impact the NEIR <br />levels of the proposed site. <br /> <br />N/A N/A <br /> <br />Certification that the proposed <br />antenna(s) will not cause <br />interference with other <br />telecommunications devices. <br /> <br />5.10.8 (A) <br />(1) (r) <br /> <br />1. A Structural Analysis report <br />completed by B ant T <br />Engineering, sealed by Chad <br />Tuttle, describing the tower’s <br />capacity and structural <br />integrity as well as <br />compliance with applicable <br />State building code dated <br />August 9, 2010, and <br />2. A Structural Analysis Report <br />completed by FDH <br />Engineering Inc., sealed by <br />Christopher Ply, describing <br />the tower’s capacity and <br />structural integrity as well as <br />compliance with applicable <br />State building code dated <br />April 30, 2014. <br /> <br />This information is contained <br />throughout these reports indicating <br />the antenna on the existing <br />telecommunication tower will not <br />cause interference. <br /> <br />Yes Yes <br /> <br />A written affidavit stating why "the <br />proposed site is necessary for their <br />communications service". <br /> <br />5.10.8 (A) <br />(1) (s) <br /> <br />Application (Attachment 2) contains <br />a narrative outlining the rationale <br />and need with respect to relocating <br />the existing driveway in order to <br />ensure the continued provision of <br />Yes Yes
The URL can be used to link to this page
Your browser does not support the video tag.