Orange County NC Website
Approved 10/10/2016 <br />21 <br />James Bryan: Yes, this is, I think, just another example of just poor draftsmanship in the UDO. This is not a 1 <br />standard from which any Board can say yes or no. So, either N/A or yes because… 2 <br /> 3 <br />Michael Harvey: Next, the applicant shall demonstrate and provide a description in writing and by drawing 4 <br />how it shall effectively screen from view the base and all related equipment and structures; we’re g oing to 5 <br />refer you to the application attachment 2 and the site plan and vicinity map again with the same rationale I 6 <br />indicated above. They’re showing existing vegetation, as well as proposed vegetation to augment what’s 7 <br />already on site. The site plan shall indicate a location of at least 2 equipment buildings in addition to that 8 <br />proposed for use by the applicant; I’ll refer you to the original SUP application and the recorded SUP that 9 <br />provides this information. I’ll also tell you that the current site plan that’s submitted shows locations of 10 <br />structures on the property and there are a minimum of 2. Page 129, all utilities at a facility site shall be 11 <br />installed underground and in compliance with all laws, ordinances, rules and regulations of the County 12 <br />where appropriate; I have made a finding of N/A as the relocation of the drive will not impact existing 13 <br />utilities. 14 <br /> 15 <br />James Bryan: I don’t think they would have to comply, I don’t know if there are existing utilities. 16 <br /> 17 <br />Samantha Cabe: We had testimony that there wa s electricity being provided. Can we have Mr. Parker 18 <br />testify as to whether that was underground? 19 <br /> 20 <br />Paul Parker: That’s the plan, yes, ma’am. Underground utilities. 21 <br /> 22 <br />Samantha Cabe: Is it not already there? 23 <br /> 24 <br />Paul Parker: No, we have not… We have electricity on the site on a current access but, not where we’re 25 <br />applying for right now. 26 <br /> 27 <br />Samantha Cabe: So you’re going to dig up the electrical access and move it too? 28 <br /> 29 <br />Paul Parker: We’re going to abandon and put in new. 30 <br /> 31 <br />Barry Katz: I think what he’s saying is that in order for the gate to be electronically monitored there has to 32 <br />be electricity going to it. 33 <br /> 34 <br />Paul Parker: This is electricity to run the towers. 35 <br /> 36 <br />Barry Katz: So, you’re testimony is that all utilities will be underground where appropriate. 37 <br /> 38 <br />Paul Parker: Yes. 39 <br /> 40 <br />Michael Harvey: Applicant testimony indicates that they’ll comply with all utilities being underground where 41 <br />appropriate. 42 <br /> 43 <br />Jerry Bouche: The current subdivision is all underground. 44 <br /> 45 <br />Barry Katz: And is that a good excess power available for you to use that ok?.. I see, ok. 46 <br /> 47 <br />Michael Harvey: Ok, the next standard’s 5.10.8 B4J, all wireless support structures shall satisfy all 48 <br />applicable public safety, land use, or zoning issues required in this Ordinance; I’m going to refer you to the 49