Browse
Search
Agenda - 12-12-2006-9g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 12-12-2006
>
Agenda - 12-12-2006-9g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:21:48 PM
Creation date
8/29/2008 9:58:23 AM
Metadata
Fields
Template:
BOCC
Date
12/12/2006
Document Type
Agenda
Agenda Item
9g
Document Relationships
2006 S ERCD - MOA Town of Hillsborough Planning for Fairview Park County Parks Operations Base and Town and County Public Works Facilities
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20061212
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />determining the exact location of the proposed land swap to accommodate the Hillsborough <br />Motor Pool/Public Works site. Ongoing discussions between County and Town leadership <br />and staff recently culminated in a site walk through that resulted in a proposed solution to this <br />remaining concern. <br />Attachment 2 is a letter from the Town Manager Eric Peterson outlining a land swap in which <br />the Town would reduce the size of the land they would receive, partner with the County for <br />shared meeting space within a renovated Link Government Services Center, and reserve <br />certain properties for future use to. be negotiated. <br />Attachment 3 is a map that describes the proposed land swap. <br />Attachment 4 - by way of reference - is the Committee Recommendations section of the <br />Master Plan (January 2006) with a NOTE added to incorporate the proposed land swap <br />under "Master Plan Rationale" on page 3 of the Attachment (page 14 of this agenda <br />abstract), and the Hillsborough letter to serve as "Appendix 4". <br />The Hillsborough Town Board discussed this item at its meeting last night (Monday, <br />December 11th), and the Town Board gave its approval/endorsement of the Fairview Public <br />Campus Master Plan with the proviso that before the design and construction of the park <br />facilities, there be some discussion/consideration between the two Boards on providing an <br />alternative amenity instead of the tennis courts. <br />FINANCIAL IMPACT: There is no cost associated with the confirmation of the proposed <br />land swap within the Fairview Public Campus Master Plan. The 2001 voter approved bonds <br />included $850,000 for development and construction of Phase Two of Fairview Park. <br />Next steps needed to facilitate the land swap will include retaining a surveyor and developing <br />the plats and deeds to be recorded subject to Legal review and Board approvals. The Town <br />has proposed taking the lead on these land service activities and requesting its attorney to <br />develop a proposed cost-sharing agreement for management review~and adoption by both <br />Boards. . <br />RECOMMENDATION(S): The Manager recommends that the Board <br />1) confirm the proposed land swap as outlined and applicable to the approved Fairview <br />Public Campus Master Plan; and <br />2) commit to discuss/consider providing an alternative amenity instead of the tennis <br />courts, as proposed by the Hillsborough Board of Commissioners, before the design <br />and construction of the park facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.