Orange County NC Website
1 <br />LeAnne Brown: You indicated in response to Mr. Katz question that although you’re working out at PFab 2 <br />that you plan to conduct this operation in the barn and that you were proposing to build at Morrow Mill or 3 <br />have built at Morrow Mill Road. Where exactly in the barn will you be storing equipment? 4 <br /> 5 <br />Chris Brewer: The processing equipment? 6 <br /> 7 <br />LeAnne Brown: Yes. 8 <br /> 9 <br />Chris Brewer: The kitchen area. 10 <br /> 11 <br />LeAnne Brown: When you say the kitchen area, is that the kitchen area that is also available to be used by 12 <br />wedding caterers. 13 <br /> 14 <br />Chris Brewer: Yes, Ma’am. 15 <br /> 16 <br />LeAnne Brown: And how large is the equipment that you plan to store in the kitchen that the wedding 17 <br />caterers will be using? 18 <br /> 19 <br />Chris Brewer: So what we’re using now is probably about 3 feet in diameter and about 3 feet tall. The kettle 20 <br />that we use now. We would probably want to get something a little bit larger than that. As we project to 21 <br />have more chestnuts than what we’re producing now. So we would probably want to have a larger kettle. 22 <br /> 23 <br />LeAnne Brown: In the 4,600 square feet of barn that you are building on Morrow Mill Road how many 24 <br />square feet of that will be devoted to storing this 3 foot by 3 foot piece of equipment in the kitchen? 25 <br /> 26 <br />Chris Brewer: Well it would probably be a bit larger than 3 by 3 but maybe 5 by 5. So 25 square feet. 27 <br /> 28 <br />LeAnne Brown: 25 square feet are necessary in order to store the entirety of your equipment for the 29 <br />chestnut operation? 30 <br /> 31 <br />Chris Brewer: Yes, ma’am. But we also need… The drying the chestnuts is important as well. We have to 32 <br />be able to let the chestnuts sit out and dry for a day before we actually put them in the water bath. And then 33 <br />once we put them in the water bath we need them to dry before we put them in refrigeration. So actually 34 <br />having the space to be able to set the chestnuts out on tables is very helpful. 35 <br /> 36 <br />LeAnne Brown: And so how do you work that with using this barn for a wedding which Ms. Brewer testified 37 <br />that you have advertised that when a bride uses this as her wedding venue she has the full run of the 38 <br />entirety of your farm? Would you explain to me how those two things work together? 39 <br /> 40 <br />Chris Brewer: Sure. Well you’re not forced the chestnuts every day. So you can accumulate chestnuts over 41 <br />1, 2, or 3 days, which is basically what we’ve been doing now, and then you can process them all at once. 42 <br />And then go 3 more days before you have chestnuts. So a day or so is very doable. 43 <br /> 44 <br />LeAnne Brown: And where do you keep all these chestnuts while the bride has full run of your barn? 45 <br /> 46 <br />Chris Brewer: I think we’ll have a kitchen by then and we’ll have refrigeration. 47 <br /> 48 <br />81