Browse
Search
BOA agenda 121216
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2016
>
BOA agenda 121216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:24:58 PM
Creation date
3/6/2018 4:15:15 PM
Metadata
Fields
Template:
BOCC
Date
12/12/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 121216
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
processing of agricultural products, equipment, agritourism, such as educational workshops, school field 1 <br />trips, weddings, retreats, and farm dinners. 2 <br /> 3 <br />LeAnne Brown: So we have 10 staff members and 250 guests on the application for wastewater permit. Is 4 <br />that correct? 5 <br /> 6 <br />Michael Harvey: Correct. 7 <br /> 8 <br />LeAnne Brown: And it identified three events per week, is that correct? 9 <br /> 10 <br />Michael Harvey: I don’t see where it says three events per week, it says Friday and Saturday number of 11 <br />employees and I just alluded to you, 10 max and number of guests, 250. Monday through Thursday the 12 <br />number of employees is 5 max, number of guests is zero. 13 <br /> 14 <br />LeAnne Brown: Can you look at those materials and tell the size of the design square footage? Do you 15 <br />have the letters passed back and forth in that file? 16 <br /> 17 <br />Michael Harvey: The information provided to me by the health department; I have a February 19th letter. 18 <br />Based on the design flow of 2,750 gallons per day was assigned in accordance with applicable sewage 19 <br />treatment system regulations per the state. 20 <br /> 21 <br />LeAnne Brown: Do you have a letter requiring 82,000 square foot? 22 <br /> 23 <br />Michael Harvey: Yes, that’s the next line. Design flow of 2,750 gallons per day when need approximately 24 <br />82, 500 square feet of suitable soil area. 25 <br /> 26 <br />LeAnne Brown: Is that about 1.89 acres? 27 <br /> 28 <br />Michael Harvey: Approximately, yes. 29 <br /> 30 <br />LeAnne Brown: I have no further questions of Mr. Harvey. 31 <br /> 32 <br />Andy Petesch: Thank you. Mr. Harvey, do you have a copy of the earlier Minutes from the November 9th 33 <br />Board of Adjustment meeting? 34 <br /> 35 <br />Michael Harvey: Yes. 36 <br /> 37 <br />Andy Petesch: And would you turn to page 3 please? 38 <br /> 39 <br />Michael Harvey: Alright. 40 <br /> 41 <br />Andy Petesch: And then starting on line 17, that paragraph was your testimony to the Board , is that 42 <br />correct? 43 <br /> 44 <br />Michael Harvey: Correct. 45 <br /> 46 <br />Andy Petesch: And would you read the first two or three sentences there for the Board, beginning on line 47 <br />20? 48 <br />32
The URL can be used to link to this page
Your browser does not support the video tag.