Orange County NC Website
natural vegetation as possible will <br />be maintained around the access <br />road and tower compound, which <br />serves as the required landscape <br />buffer for so long as the natural <br />landscape remains on the property <br />and around the facility, and if it is <br />ever removed Applicant will install <br />the required Type C land use <br />buffer. <br /> <br /> <br />Visibility of balloon shall not <br />constitute sole justification of denial <br />but shall serve as an indication of <br />what location on the site may be <br />less visually intrusive. <br /> <br />5.10.8 (B) (4) <br />(f) <br /> <br />Abstract (Attachment 5) <br /> <br />Proposed Finding: As detailed in <br />the aforementioned Attachment 5, <br />the balloon test demonstrates the <br />top portion of the proposed tower <br />will be visible but the tower <br />structure as a whole will not be <br />visible from identified locations. <br /> <br /> <br /> <br />The applicant shall demonstrate <br />and provide a description in writing <br />and by drawing how it shall <br />effectively screen from view the <br />base and all related equipment and <br />structures of the proposed facility. <br /> <br />5.10.8 (B) (4) <br />(g) <br /> <br />Site Survey and Construction <br />Drawings; landscape plan; <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br /> <br />Proposed Finding: The facility is on <br />a densely wooded property, and <br />by maintaining tree lines around <br />the access road and tower <br />compound, and further proposed a <br />landscape plan in case natural <br />vegetation is removed from the <br />property or from around the facility. <br /> <br />Yes <br /> <br />The site plan shall indicate a <br />location for at least two equipment <br />buildings in addition to that <br />proposed for use by the applicant. <br /> <br />5.10.8 (B) (4) <br />(h) <br /> <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br /> <br />Proposed Finding: The site plan <br />indicates a location for three <br />equipment buildings in addition to <br />the one proposed by the Applicant. <br /> <br />Yes <br /> <br />All utilities at a facility site shall be <br />installed underground and in <br />compliance with all Laws, <br />ordinances, rules and regulations of <br />the County. <br /> <br /> <br />5.10.8 (B) (4) <br />(i) <br /> <br /> <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br /> <br />Proposed Finding: Applicant stated <br />it will work with Duke Energy to <br />request underground utility <br />delivery. This is also referenced on <br />the site plan. <br /> <br /> <br />Yes; <br />pend <br />ing <br />cond <br />ition <br />#17 <br /> <br /> <br />All wireless support structures shall <br />5.10.8 (B) (4) <br />(j) <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br />Yes; <br />pend <br /> <br />156