Browse
Search
BOA agenda 121216
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2016
>
BOA agenda 121216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:24:58 PM
Creation date
3/6/2018 4:15:15 PM
Metadata
Fields
Template:
BOCC
Date
12/12/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 121216
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buffer (RB), i.e., property zoned for <br />residential use (UDO <br />5.10.8(B)(4)(b)(i)(f)). <br /> <br />Facility siting is not possible at the <br />locations identified in this <br />subsection. There are no existing <br />monopole, lattice, or guyed <br />wireless telecommunications <br />structures within one-half (1/2) mile <br />of the proposed wireless support <br />structure. <br /> <br />Fall zone setbacks of 110% of <br />tower height (not including lighting <br />rod) <br /> <br />5.10.8 (B) (4) <br />(c) <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br /> <br />Proposed Finding: The tower is <br />proposed to be 199 feet tall which <br />would require a 218.9 foot setback. <br /> <br />It is set back approximately 703 <br />feet from the northern property line, <br />432 feet from the eastern property <br />line, 382 feet from the southern <br />property line, and 220 feet from the <br />western property line. <br /> <br />These proposed setbacks further <br />comply with required building <br />setbacks for the Rural Buffer <br />zoning district. <br /> <br />Yes <br />Access <br /> <br />5.10.8 (B) (4) <br />(d) <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br /> <br />Proposed Finding: There will be a <br />twelve foot wide gravel access <br />driveway approximately 1,404 feet <br />in length from the Mount Carmel <br />Church Road public right-of-way to <br />the facility site, and 20’ x 40’ <br />turnaround and parking area will be <br />provided at the entrance of the <br />facility compound, and the <br />maximum amount of vegetation <br />possible will be preserved around <br />the access road. <br /> <br />Yes <br /> <br />Landscape and Buffers – Type C <br />land use buffer <br /> <br /> <br />5.10.8 (B) (4) <br />(e) <br /> <br />Application package (TAB 8) and <br />Narrative (TAB 1) <br /> <br />Proposed Finding: The facility will <br />be located on a densely wooded <br />property and as much existing <br />Yes <br />pend <br />ing <br />cond <br />ition <br />#2 <br /> <br />155
The URL can be used to link to this page
Your browser does not support the video tag.