Orange County NC Website
received by the applicant in <br />response to the balloon test along <br />with color photographs from various <br />locations around the balloon. <br /> <br /> <br /> <br />Evidence that the balloon test <br />requirement has been met. <br /> <br />5.8.10 (B) <br />(3) (i) <br /> <br />Abstract (Attachment 5) ; <br />Application package (TAB 1) <br /> <br />Yes <br /> <br /> <br />A notarized statement that the sign <br />posting requirement has been met. <br /> <br />5.8.10 (B) <br />(3) (j) <br />Abstract (Attachment 5) ; <br />Application package (TAB 1) <br /> <br />Yes <br /> <br />Photographs of a clearly visible <br />balloon floated at the proposed <br />tower location as well as <br />photographs with the proposed <br />tower and associated antennas <br />superimposed upon them showing <br />what the proposed tower will look <br />like. <br /> <br />5.8.10 (B) <br />(3) (k) <br /> <br />Abstract (Attachment 5) ; <br />Application package (TAB 1) <br /> <br />Yes <br /> <br />The Special Use Permit application <br />shall include a statement that the <br />facility and its equipment will <br />comply with all federal, state and <br />local emission requirements. <br /> <br />5.8.10 (B) <br />(3) (l) <br /> <br />Application package (TAB(s) 12 and <br />17) and Narrative (TAB 1) <br />Yes <br /> <br />Environmental Assessment <br />Analysis and a Visual addendum. <br /> <br />5.8.10 (B) <br />(3) (m) <br /> <br />Environmental Assessment is not <br />required. <br /> <br /> <br />N/A <br /> <br />Visual Impact Assessment <br />requirements <br /> <br />5.8.10 (B) <br />(3) (n) <br /> <br />Abstract (Attachment 5) ; <br />Application package (TAB 1) <br /> <br /> <br /> <br />Demonstration that the wireless <br />support structure is sited so as to <br />have the least visually intrusive <br />effect reasonably possible and <br />have the least adverse visual effect <br />on the environment and its <br />character, on existing vegetation, <br />and on the residences in the area <br />of the telecommunications tower. <br /> <br />5.8.10 (B) <br />(3) (o) <br /> <br />Abstract (Attachment 5) ; <br />Application package (TAB(s) 8 and <br />13) and Narrative (TAB 1) <br /> <br /> <br /> <br />A statement, prepared by a <br />professional engineer licensed in <br />the State of North Carolina <br />certifying the tower's compliance <br />with applicable standards as set <br />5.8.10 (B) <br />(3) (p) <br /> <br />Application package (TAB 10) and <br />Narrative (TAB 1) <br />Yes <br />151