Orange County NC Website
REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />USE SPECIFIC SUBMITTAL REQUIREMENTS for Telecommunication Facilities (continued) <br /> <br />The make, model and manufacturer <br />of the tower and antenna(s), <br />antenna heights and power levels <br />of proposed site. <br /> <br />5.10.8 (A) <br />(1) (l) <br /> <br />Application (TAB(s) 8, 15, and 16) <br />and Narrative (Tab 1) <br />Yes <br /> <br />The frequency, modulation and <br />class of service of radio or other <br />transmitting equipment. <br /> <br />5.10.8 (A) <br />(1) (m) <br /> <br />Application (TAB(s) 15 and 16) and <br />Narrative (Tab 1) <br />Yes <br /> <br />The maximum transmission power <br />capability of all radios, as designed, <br />if the applicant is a cellular facility. <br /> <br />5.10.8 (A) <br />(1) (n) <br /> <br />Application (TAB(s) 15 and 16) and <br />Narrative (Tab 1) <br />Yes <br /> <br />The actual intended transmission <br />and the maximum effective radiated <br />power of the antenna(s). <br /> <br />5.10.8 (A) <br />(1) (o) <br /> <br />Application (TAB(s) 15 and 16) and <br />Narrative (Tab 1) <br />Yes <br /> <br />The direction(s) of maximum lobes <br />and associated radiation of the <br />antenna(s). <br /> <br />5.10.8 (A) <br />(1) (p) <br /> <br />Application (TAB(s) 15 and 16) and <br />Narrative (Tab 1) <br />Yes <br /> <br />Certification that the NIER levels at <br />the proposed site are within the <br />threshold levels adopted by the <br />FCC. <br /> <br />5.10.8 (A) <br />(1) (q) <br /> <br />Application (TAB 17) and Narrative <br />(TAB 1) <br />Yes <br /> <br />Certification that the proposed <br />antenna(s) will not cause <br />interference with other <br />telecommunications devices. <br /> <br />5.10.8 (A) <br />(1) (r) <br /> <br />Application (TAB 17) and Narrative <br />(TAB 1) <br />Yes <br /> <br />A written affidavit stating why "the <br />proposed site is necessary for their <br />communications service". <br /> <br />5.10.8 (A) <br />(1) (s) <br /> <br />Application (TAB(s) 4, 5, 6, 7 and <br />21) and Narrative (Tab 1) <br />Yes <br /> <br />A copy of the FCC license <br />applicable for the intended use of <br />the facility as well as a copy of the <br />5 and 10 year building out plan <br />required by the FCC. <br /> <br />5.10.8 (A) <br />(1) (t) <br /> <br />Application (TAB 18) and Narrative <br />(TAB 1) <br />Yes <br /> <br />149