Orange County NC Website
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />GENERAL SUBMITTAL REQUIREMENTS (APPLICATION COMPONENTS) <br />Proper forms 2.2 Application (TAB(s) 1 and 2 of <br />binder) <br /> <br />Yes <br />Fees paid 2.2.4(D) Staff Testimony/Application <br />(TAB(s) 1 and 2 of binder) <br /> <br /> <br />Yes <br /> <br />Full description of use <br />• Location <br />• Appearance <br />• Operational <br />characteristics <br /> <br />2.7.3(B)(1) Application (Narrative contained <br />in TAB 1. Application package <br />provides required detail per the <br />UDO) <br /> <br />Yes <br /> <br />Owner Information 2.7.3(B)(2) Application (TAB(s) 1, 2, 3, and <br />8 of binder) <br /> <br />Yes <br />Information needed for Use <br />Standards <br /> <br />2.7.3(B)(3) Application (Narrative contained <br />in TAB 1. Application package <br />provides required detail per the <br />UDO) <br /> <br /> <br />Yes <br /> <br />Site Plans <br />(10 copies for Class B; 26 for <br />Class A) <br /> <br />2.7.3(B)(4) Application/Staff Testimony (Site <br />plan) <br /> <br />Yes <br /> <br />Preliminary Subdivision Plat <br />(if necessary) <br /> <br />2.7.3(B)(5) [No subdivision proposed for <br />project] <br />N/A <br />List of parcels within 1,000 <br />feet <br /> <br />2.7.3(B)(6) Application (TAB 19 of binder) Yes <br />Elevations of all structures 2.7.3(B)(7) Application (Site plan in TAB 8) <br /> <br />Yes <br />Environmental Assessment <br />(or EIS) <br />• Topography <br />• Drainage issues <br />• Natural or Cultural <br />resources <br />• Mining <br />• Hazardous Wastes <br />• Wastewater treatment <br />• Water usage <br /> <br />2.7.3(B)(8) Project exempt per Section(s) <br />6.16.2 and 6.16.3 of UDO <br /> <br />Proposed level of land <br />disturbance for project does not <br />meet established thresholds for <br />an environmental assessment to <br />be completed. <br />N/A <br />Method of Debris Disposal <br /> <br />2.7.3(B)(9) Application (Narrative in TAB 1 ; <br />Site plan in TAB 8) <br /> <br />Yes <br />Development Schedule <br /> <br />2.7.3(B)(10) Application (Narrative in TAB 1 ; <br />Site plan in TAB 8) <br /> <br />Yes <br />Extended Vesting Request <br /> <br />2.7.3(B)(11) Not requested N/A <br />145