Browse
Search
BOA agenda 101016
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2016
>
BOA agenda 101016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:14:58 PM
Creation date
3/6/2018 4:09:44 PM
Metadata
Fields
Template:
BOCC
Date
10/11/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 101016
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
therefore, it’s traffic impacts are minimal. The only earth work done on the site will be to create the 1 <br />proposed 15 foot wide gravel access road across the site in adjacent land and parts on number 2 <br />9883177293. The applicant has an executed easement agreement which is recorded with the adjacent 3 <br />property owned. With respect to harmony; with the surrounding area in compliance with the comprehensive 4 <br />plan the location and character of the use will largely remain the same as it was approved in 1996. Hence, 5 <br />no tower will be raised, just an access road we’re trying to get to the tower site. There will not be an 6 <br />increase in traffic with the site. Between 2001 and 2015 there are approximately 26 trips by Crown service 7 <br />technicians to the tower. That amounts to approximately 2 trips a year. So, with respect to this use being in 8 <br />harmony with the area the same factors that led the Board in 1996 will remain applicable with the grant of 9 <br />this request. With respect to the method and adequacy provisions of sewage disposal facilities, solid waste, 10 <br />and water there will be no negative impacts to the provisions of services and utilities, soil, erosion and 11 <br />sediment or public community or private water supplies. We don’t supply water to the tower site. We do 12 <br />supply electricity to the site, that’s it. Crown will obtain all necessary soil and erosion permits as a part of 13 <br />the zoning compliance permitting requirements of the county after this request is approved. With respect to 14 <br />method and adequacy of the provision police, fire, and rescue squad protection the site is appropriately 15 <br />located to be served by police, fire, and rescue services. As indicated in the staff report Orange County 16 <br />Emergency Services and the Sheriff’s Offices have indicated the project can be served. With respect to the 17 <br />method and adequacy, vehicular access to the site and traffic conditions around the site, the change in the 18 <br />access road location will not result in an increased traffic to the site. Again, that would be approximately 2 19 <br />visits to the site per year by Crown employees. Does anybody have any questions? 20 <br /> 21 <br />Henry Kampen: One question, just to be clear… My understanding that Crown’s not proposing a single 22 <br />solitary change to the existing tower… Is that correct? 23 <br /> 24 <br />Paul Parker: That is correct. The only change is that we are adding additional foliage and landscaping 25 <br />around it. 26 <br /> 27 <br />Michael Harvey: Mr. Parker, you may have said this but I didn’t hear it. Would you please state if you were 28 <br />sworn? 29 <br /> 30 <br />Paul Parker: I am Paul Parker. Raleigh, North Carolina, and I am sworn. 31 <br /> 32 <br />Michael Harvey: Thank you. 33 <br /> 34 <br />Barry Katz: You are going to move the gate? 35 <br /> 36 <br />Paul Parker: We will have a gate at the… 37 <br /> 38 <br />Barry Katz: From one side to the other? 39 <br /> 40 <br />Paul Parker: Yes… This will be an extremely secure site, as all of our sites are. From where we come off of 41 <br />the public right away there’s going to be a gate and then when we exit the Perry Sloan parcel there’s going 42 <br />to be another locked gate there. And then, on either side there’s going to be an 8 foot chain link fence with 43 <br />razor wire at the top. 44 <br /> 45 <br />Barry Katz: Will the gate be after the turn or at the turn? 46 <br /> 47 <br />Paul Parker: The gate is proposed to be, it should show it on the site plan… 48 <br /> 49 <br />8
The URL can be used to link to this page
Your browser does not support the video tag.