Orange County NC Website
All utilities at a facility site shall be <br />installed underground and in <br />compliance with all Laws, <br />ordinances, rules and regulations of <br />the County where appropriate. <br /> <br />(4) (i) <br /> <br />this provision is not applicable as <br />there are no utilities being proposed <br />with this proposal. <br /> <br />The re-location of the driveway will <br />not impact existing utilities. <br /> <br /> <br />All wireless support structures shall <br />satisfy all applicable public safety, <br />land use, or zoning issues required <br />in this Ordinance. <br /> <br />5.10.8 (B) <br />(4) (j) <br /> <br />Application (Attachment 2) and Staff <br />testimony. <br /> <br />The project, specifically the re- <br />location of the driveway, will not <br />impact the existing wireless support <br />structure from a public safety, land <br />use, or zoning standpoint. <br /> <br />Re-location of the driveway will not <br />increase traffic on existing State <br />maintain roadways as to create a <br />public safety hazard. <br /> <br />Re-location of the driveway will <br />allow for the continued operation of <br />the facility as identified by the <br />applicant. <br /> <br />Yes Yes <br />Fences and Walls <br /> <br />5.10.8 (B) <br />(4) (k) <br /> <br />Application (Attachment 2) ; Site <br />Plan. <br /> <br />The site plan denotes the location of <br />proposed fences and walls for the <br />existing telecommunication <br />compound as well as the access <br />road. <br /> <br />Yes Yes <br /> <br />Tower is structurally designed to <br />support additional users. <br /> <br />5.10.8 (B) <br />(4) (l) <br /> <br />1. Original Special Use Permit <br />Application file, <br />2. A Structural Analysis report <br />completed by B ant T <br />Engineering, sealed by Chad <br />Tuttle, describing the tower’s <br />capacity and structural <br />integrity as well as <br />compliance with applicable <br />State building code dated <br />August 9, 2010, and <br />3. A Structural Analysis Report <br />completed by FDH <br />Engineering Inc., sealed by <br />Christopher Ply, describing <br />the tower’s capacity and <br />structural integrity as well as <br />compliance with applicable <br />State building code dated <br />April 30, 2014. <br />Yes Yes <br />61