Browse
Search
BOA agenda 101016
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2016
>
BOA agenda 101016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:14:58 PM
Creation date
3/6/2018 4:09:44 PM
Metadata
Fields
Template:
BOCC
Date
10/11/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 101016
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
superimposed upon them showing <br />what the proposed tower will look <br />like. <br /> <br />the application did not proposed a <br />‘new wireless support structure’ as <br />detailed in Section 5.8.10 (B) (2) of <br />the UDO. <br /> <br /> <br />The Special Use Permit application <br />shall include a statement that the <br />facility and its equipment will <br />comply with all federal, state and <br />local emission requirements. <br /> <br />5.8.10 (B) <br />(3) (l) <br /> <br />Original Special Use Permit <br />Application file and recorded Special <br />Use Permit allowing for the erection <br />of the approved tower. This <br />information can be found on page(s) <br />200 through 240 of the <br />supplemental information supplied <br />to the Board. <br /> <br />The Structural Analysis contained <br />on pages 241 through 341 provide <br />proof that the tower is sound and <br />equipment is consistent with <br />applicable local, State, and Federal <br />regulations. <br /> <br />This is also a requirement of the <br />Orange County Unified <br />Development Ordinance (UDO) in <br />order for the tower to remain in use. <br /> <br /> <br />Yes Yes <br /> <br />Environmental Assessment <br />Analysis and a Visual addendum. <br /> <br />5.8.10 (B) <br />(3) (m) <br /> <br />Staff is recommending a finding that <br />this provision is not applicable as <br />the project does not involve the <br />erection of a telecommunication <br />tower requiring the submittal of a <br />visual addendum or analysis. <br /> <br />As previously indicated herein the <br />proposed will not generate sufficient <br />land disturbance to require an <br />Environmental Assessment per the <br />requirements of the UDO. <br /> <br />This section indicates an <br />Environmental Assessment Analysis <br />and Visual Addendum ‘may’ be <br />required. It is not mandatory. <br /> <br />As the project does not alter the <br />existing telecommunication facility <br />staff did not require compliance with <br />this provision of the UDO. <br /> <br />N/A N/A <br />1 <br />57
The URL can be used to link to this page
Your browser does not support the video tag.