Browse
Search
BOA agenda 101016
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2016
>
BOA agenda 101016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:14:58 PM
Creation date
3/6/2018 4:09:44 PM
Metadata
Fields
Template:
BOCC
Date
10/11/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 101016
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
integrity as well as <br />compliance with applicable <br />State building code dated <br />August 9, 2010, and <br />3. A Structural Analysis Report <br />completed by FDH <br />Engineering Inc., sealed by <br />Christopher Ply, describing <br />the tower’s capacity and <br />structural integrity as well as <br />compliance with applicable <br />State building code dated <br />April 30, 2014. <br /> <br />This information is contained <br />throughout all identified documents. <br />There is also specific detail(s) <br />referenced on page(s) 323-341 of <br />the supplemental package. <br /> <br /> <br />The actual intended transmission <br />and the maximum effective radiated <br />power of the antenna(s). <br /> <br />5.10.8 (A) <br />(1) (o) <br /> <br />1. Original Special Use Permit <br />Application file, <br />2. A Structural Analysis report <br />completed by B ant T <br />Engineering, sealed by Chad <br />Tuttle, describing the tower’s <br />capacity and structural <br />integrity as well as <br />compliance with applicable <br />State building code dated <br />August 9, 2010, and <br />3. A Structural Analysis Report <br />completed by FDH <br />Engineering Inc., sealed by <br />Christopher Ply, describing <br />the tower’s capacity and <br />structural integrity as well as <br />compliance with applicable <br />State building code dated <br />April 30, 2014. <br /> <br />This information is contained <br />throughout all identified documents. <br />There is also specific detail(s) <br />referenced on page(s) 323-341 of <br />the supplemental package. <br /> <br />Yes Yes <br /> <br />The direction(s) of maximum lobes <br />and associated radiation of the <br />antenna(s). <br /> <br />5.10.8 (A) <br />(1) (p) <br /> <br />1. Original Special Use Permit <br />Application file, <br />2. A Structural Analysis report <br />completed by B ant T <br />Engineering, sealed by Chad <br />Tuttle, describing the tower’s <br />capacity and structural <br />integrity as well as <br />Yes Yes <br />50
The URL can be used to link to this page
Your browser does not support the video tag.