Orange County NC Website
1 <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities (continued) <br /> <br />The make, model and manufacturer <br />of the tower and antenna(s), <br />antenna heights and power levels <br />of proposed site. <br /> <br />5.10.8 (A) <br />(1) (l) <br /> <br /> <br />Original Special Use Permit <br />Application file and recorded Special <br />Use Permit allowing for the erection <br />of the approved tower as contained <br />in the supplemental information <br />packet (pages 200 through 240). <br /> <br />The original application identified <br />this information. <br /> <br />Yes Yes <br /> <br />The frequency, modulation and <br />class of service of radio or other <br />transmitting equipment. <br /> <br />5.10.8 (A) <br />(1) (m) <br /> <br />1. Original Special Use Permit <br />Application file, <br />2. A Structural Analysis report <br />completed by B ant T <br />Engineering, sealed by Chad <br />Tuttle, describing the tower’s <br />capacity and structural <br />integrity as well as <br />compliance with applicable <br />State building code dated <br />August 9, 2010, and <br />3. A Structural Analysis Report <br />completed by FDH <br />Engineering Inc., sealed by <br />Christopher Ply, describing <br />the tower’s capacity and <br />structural integrity as well as <br />compliance with applicable <br />State building code dated <br />April 30, 2014. <br /> <br />This information is contained <br />throughout all identified documents. <br />There is also specific detail(s) <br />referenced on page(s) 323-341 of <br />the supplemental package. <br /> <br />The Tower’s capacity is not an issue <br />as nothing associated with the <br />relocation of the driveway impacts <br />the frequency, modulation, and <br />class of service of equipment. <br /> <br />Yes Yes <br /> <br />The maximum transmission power <br />capability of all radios, as designed, <br />if the applicant is a cellular facility. <br /> <br />5.10.8 (A) <br />(1) (n) <br /> <br />1. Original Special Use Permit <br />Application file, <br />2. A Structural Analysis report <br />completed by B ant T <br />Engineering, sealed by Chad <br />Tuttle, describing the tower’s <br />capacity and structural <br />Yes Yes <br />49