Browse
Search
BOA agenda 101016
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2016
>
BOA agenda 101016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:14:58 PM
Creation date
3/6/2018 4:09:44 PM
Metadata
Fields
Template:
BOCC
Date
10/11/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 101016
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities <br />Site Plan <br />A site plan prepared in accordance <br />with Section 2.5 of UDO <br /> <br />5.10.8 (A) <br />(1) (a) <br />Application, Applicant Testimony, <br />Staff Testimony, and Site plan <br /> <br /> <br />Yes Yes <br /> <br />A detailed description of the <br />proposed telecommunication <br />support structure (i.e. monopole, <br />self-supporting lattice, etc.) <br />including a detailed narrative <br />description and explanation of the <br />specific objective(s) for the new <br />facility including a description as to <br />the coverage and/or capacity, <br />technical requirements, and the <br />identified boundaries of the specific <br />geographic area of intended <br />coverage for the proposed <br />telecommunication support <br />structure. <br /> <br />5.10.8 (A) <br />(1) (b) <br /> <br /> <br />Original Special Use Permit <br />Application file and recorded Special <br />Use Permit allowing for the erection <br />of the approved tower. This <br />information can be found on page(s) <br />200 through 240 of the <br />supplemental information supplied <br />to the Board. <br /> <br />The original application file for the <br />project contains a description of the <br />telecommunication tower as well as <br />a narrative explaining the objectives <br />of the tower as proposed in 1996. <br />The recorded Special Use Permit <br />also contains a description of the <br />approved tower, specifically a 160 ft. <br />monopole telecommunication tower. <br /> <br />The existing facility will not be <br />modified as part of this request. All <br />that is being modified is the access <br />driveway serving the tower from <br />Landau Drive to Old Oak Place (SR <br />2268). <br />Yes <br /> <br />Yes <br /> <br />Elevation drawings and color <br />renderings of the proposed tower. <br /> <br />5.10.8 (A) <br />(1) (c) <br /> <br /> <br />Original Special Use Permit <br />Application file and recorded Special <br />Use Permit allowing for the erection <br />of the approved tower. This <br />information can be found on page(s) <br />200 through 240 of the <br />supplemental information supplied <br />to the Board. <br /> <br />This information was part of the <br />original application package <br />reviewed and approved by the <br />Board of Adjustment on April 8, <br />1996. <br /> <br />Yes Yes <br /> <br />A signed statement from the <br />applicant certifying that the <br />proposed telecommunication <br />support structure: <br /> <br />5.10.8 (A) <br />(1) (d) <br /> <br />Original Special Use Permit <br />Application file and recorded Special <br />Use Permit allowing for the erection <br />of the approved tower. This <br />information can be found on page(s) <br />200 through 240 of the <br />Yes Yes <br />42
The URL can be used to link to this page
Your browser does not support the video tag.