Orange County NC Website
11. The applicant shall provide a copy of the FCC license for the existing telecommunication tower as required 1 <br />under Section 5.10.8 (A) (1) (t) of the UDO. 2 <br />12. The Special Use Permit will automatically expire within 12 months from the date of approval if the use has not 3 <br />commenced or construction has not commenced or proceeded unless a timely application for extension of this 4 <br />time limit is approved by the Board of Adjustment. 5 <br />13. If any condition of this Special Use Permit shall be held invalid or void, then this Special Use Permit shall be 6 <br />void in its entirety and of no effect. 7 <br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />APPLICATION COMPONENTS <br />Proper forms 2.2 Application (Attachment 2) Yes Yes <br />Fees paid 2.2.4(D) Staff Testimony/Application <br />(Attachment 2) <br /> <br />Yes <br /> <br />Yes <br />Full description of use <br />• Location <br />• Appearance <br />• Operational characteristics <br /> <br />2.7.3(B)(1) Application (Attachment 2 and Site <br />plan) <br /> <br />Yes <br /> <br />Yes <br />Owner Information 2.7.3(B)(2) Application (Attachment 2 and Site <br />plan) <br /> <br />Yes Yes <br />Information needed for Use <br />Standards <br /> <br />2.7.3(B)(3) Application (Attachment 2 and Site <br />Plan) <br /> <br /> <br />Yes <br /> <br />Yes <br />Site Plans <br />(10 copies for Class B; 26 for Class <br />A) <br /> <br />2.7.3(B)(4) Application/Staff Testimony (Site <br />plan) <br /> <br />Yes <br /> <br />Yes <br />Preliminary Subdivision Plat (if <br />necessary) <br /> <br />2.7.3(B)(5) [No subdivision proposed.] N/A <br />List of parcels within 1,000 feet <br /> <br />2.7.3(B)(6) Application (Attachment 2) Yes Yes <br />Elevations of all structures 2.7.3(B)(7) Project does not involve the erection <br />of a structure, just a relocation of a <br />driveway <br /> <br />N/A N/A <br />Environmental Assessment (or <br />EIS) <br />• Topography <br />• Drainage issues <br />• Natural or Cultural resources <br />• Mining <br />• Hazardous Wastes <br />• Wastewater treatment <br />• Water usage <br /> <br />2.7.3(B)(8) Project exempt per Section(s) <br />6.16.2 and 6.16.3 of UDO <br /> <br />Proposed level of land disturbance <br />for project does not meet <br />established thresholds for an <br />environmental assessment to be <br />completed. <br /> <br />Proposed new driveway will only <br />result in 14,000 sq.ft. of land <br />disturbing activity. <br />N/A N/A <br />Method of Debris Disposal <br /> <br />2.7.3(B)(9) Applicant Testimony Yes Yes <br />Development Schedule <br /> <br />2.7.3(B)(10) Application (Site plan) Yes Yes <br />38