Orange County NC Website
REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />APPLICATION COMPONENTS <br />Proper forms <br />2.2 <br />Application (Attachment 2) <br />Yes <br />Fees paid <br />2.2.4(D) <br />Staff Testimony <br />Yes <br />Full description of use <br />2.7.3(8)(1) <br />Application (Attachment 2) (Site plan) <br />Yes <br />• Location <br />• Appearance <br />• Operational characteristics <br />Owner Information <br />2.7.3(B)(2) <br />Application (Attachment 2) (Site plan) <br />Yes <br />Information needed for Use Standards <br />2.7.3(B)(3) <br />Application (Attachment 2) (Site plan) <br />Yes <br />Site Plans <br />2.7.3(B)(4) <br />Application (Attachment 2) (Site plan) <br />Yes <br />(10 copies for Class B; 26 for Class A) <br />Preliminary Subdivision Plat (if <br />2.7.3(B)(5) <br />[No subdivision proposed.] <br />N/A <br />necessary) <br />List of parcels within 500 feet` <br />2.7.3(B)(6) <br />Application (Attachment 2 and 3) <br />Elevations of all structures <br />2.7.3(B)(7) <br />Application (Attachment 2) (Site plan) <br />Environmental Assessment (or EIS) <br />2.7.3(B)(8) <br />Permitting for the project shall be <br />N/A <br />• Topography <br />completed through the State <br />• Drainage issues <br />• Natural or Cultural resources <br />• Mining <br />• Hazardous Wastes <br />• Wastewater treatment <br />• 1 Water usage <br />Method of Debris Disposal <br />2.7.3(B)(9) <br />Application (Attachment 2) (Site plan) <br />Yes <br />Development Schedule <br />2.7.3(B)(10) <br />Application (Attachment 2) (Site plan) <br />Yes <br />Extended Vesting Request <br />2.7.3(B)(11) <br />Not requested <br />N/A <br />NOTIFICATION REQUIREMENTS <br />Public Notice <br />2.7.5(a) <br />Application (Attachment 3) <br />Yes <br />• Date <br />• Time <br />• Place <br />Published in Newspaper <br />2.7.5(b) <br />Staff Testimony <br />Yes <br />• Two successive weeks <br />The legal ad was published in the News <br />• First notice at least ten days <br />of Orange on October 28, 2015 and <br />prior but no more than twenty -five <br />again on November 4, 2015 <br />days prior <br />Sign Posting on Property (at least 10 <br />2.7.5(c) <br />Staff Testimony <br />Yes <br />days prior) <br />posted sign on October27, 2015 <br />Mailed Notice, <br />2.7.5(d) <br />Application (Attachment 3) <br />Yes <br />• Certified mail` <br />• All adjacent property owners <br />(within 500 ft) <br />• Not less than fifteen days prior <br />