Orange County NC Website
73 <br />Patrick R. Mallett <br />From: Jeff Scouten <br />Sent: Tuesday, August 11, 2015 12:25 PM <br />To: Timothy A. Smith (tsmith @ppaengineering.com) <br />Cc: Patrick R. Mallett <br />Subject: The Barn of Chapel Hill SUP <br />Attachments: SWM Plan.doc; OCSW Design Guidelines 7- 14- 15.pdf <br />Follow Up Flag: Follow up <br />Flag Status: Flagged <br />Tim: <br />I met your client, Kara Brewer at the pre - development meeting this morning for the subject project and although I <br />briefly went over our plan requirements with her, I thought I'd go ahead and reach out to you directly. <br />We would have no objection to the granting of the SUP conditioned upon the following conditions being satisfactorily <br />addressed: <br />1. Solid Waste Management Plan —This document (attached) must be filled out and returned to me for review and <br />approval. <br />2. Refuse & Recycling Enclosure — Must be designed and built according to OCSW design standards (copy attached) <br />and a detail must be placed on the plans. <br />3. Provisions for the recycling of corrugated cardboard —The applicant may choose to provide a dedicated bulk <br />container (dumpster) for cardboard or take it to one of the County's recycling /convenience centers. If a <br />dumpster is used please show that on the plan otherwise add a note on the plan stating that the cardboard will <br />be taken to an Orange County recycling /convenience center. <br />4. Please make sure that there is adequate space to allow for collection trucks to access the garbage and recycling <br />containers and to turn around without any trouble. The turning radii for collection trucks is on the attached <br />Design Guidelines and I can provide turning radius templates if you want them. <br />5. This project may qualify for food waste recycling collection. Contact Kristina Witosky at 919 -968 -2788 x224 or <br />kwitosky @ot�angecountync.gov for more Information if there is interest in this. <br />6. Add the following construction notes to the site plan sheet: <br />Construction Waste: <br />All existing structures 500 Square Feet and larger in size shall be assessed prior to demolition to <br />ensure compliance with the County's Regulated Recyclable Materials Ordinance (RRMO) and to <br />assess the potential for de- construction and /or the re -use of salvageable materials. <br />By Orange County Ordinance, clean wood waste, scrap metal, and corrugated cardboard present in <br />construction or demolition waste must be recycled. <br />• By Orange County Ordinance, all haulers of mixed construction and demolition waste that includes <br />any regulated recyclable materials shall be licensed by Orange County. <br />• Prior to any demolition or Construction activity on the site the Applicant shall hold a pre - <br />demolition /pre - construction conference with the Solid Waste staff. This may be the same pre - <br />construction meeting held with other development /enforcement officials. <br />When you have made these plan changes and completed filling out the Solid Waste Management Plan document, please <br />send them to me as PDF e-mail attachments for final review and approval. <br />If you have any questions or wish to discuss this matter further, please let me know. <br />Thanks. <br />Jeff Scouten <br />Environmental Enforcement Supervisor <br />