Orange County NC Website
32 <br />Page 2 of 7 <br />1. Site Preparation WagIgsAlandclearing, a moption, aeconnEggjM <br />During site preparation for a project the amount of waste destined for a construction waste landfill or an inert debris <br />landfill should be minimized or diverted for reuse or recycling. Many materials can be reused, recycled, or salvaged, <br />provided that materials are kept separate. This approach may also reduce overall project waste disposal costs. Regulated <br />Recyclable Materials (clean wood waste, scrap metal and corrugated cardboard) -r <br />ff-ene ated in orange County <br />inug berec recycled. During demolition activities, metal and wood are often not "reasonably possible to separate" or doing <br />so may present health and safety concerns (asbestos, lead paint, etc.). In these cases only, are regulated materials not <br />required to be separated for recycling. Consider whether the following materials will be generated on this project, in any <br />almfi% and indicate the management method(s). <br />Rm illillilillpil 16 <br />