Browse
Search
BOA agenda 060815
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2015
>
BOA agenda 060815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 3:39:10 PM
Creation date
3/6/2018 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
6/8/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 060815
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. As you are aware staff does not make a formal recommendation on the approval of the <br />application or on the applicant’s compliance with the general standards detailed within <br />Section 5.3.2 (a) (2), specifically: <br />(1) The use will maintain or promote the public health, safety and general welfare, <br />if located where proposed and developed and operated according to the plan <br />as submitted; <br /> <br />(2) The use will maintain or enhance the value of contiguous property (unless the <br />use is a public necessity, in which case the use need not maintain or enhance <br />the value of contiguous property); and <br /> <br />(3) The location and character of the use, if developed according to the plan <br />submitted, will be in harmony with the area in which it is to be located and the <br />use is in compliance with the plan for the physical development of the County <br />as embodied in these regulations or in the Comprehensive Plan, or portion <br />thereof, adopted by the Board of County Commissioners; <br />7. There are several goals/policies detailed within the adopted 2030 Comprehensive Plan <br />addressing the development of telecommunication facilities in the County including: <br />a. Land Use Goal 1: Fiscally and environmentally responsible, sustainable <br />growth, consistent with the provision of adequate services and facilities and a <br />high quality of life. <br />b. Services and Community Facilities Goal 7: Efficient and effective public safety <br />including, police, fire, telecommunications, emergency services, and animal <br />services. <br />c. Objective PS-T-6: Develop a mechanism for cooperation with <br />telecommunication facilities stakeholders regarding the siting and design of <br />towers. <br />d. Objective PS-T-7: Manage the number of future wireless telecommunication <br />facilities by identifying preferred locations capable of accommodating service <br />Countywide. <br />e. Objective PS-T-8: Encourage the expansion of affordable, high-speed internet <br />access, fiber optic lines, and other high-speed communication networks to rural <br />and underserved areas. <br />f. Objective PS-9: Maintain a radio communication system that ensures reliable <br />notification and oversight of emergency assets, such as personnel, vehicles, <br />and response equipment, throughout Orange County and inter-operability of <br />communication among jurisdictions. <br />8. Staff held 2 neighborhood information meetings (NIM) on this project, specifically on <br />March 28th and April 11th of 2015. During these meetings staff received numerous <br />comments from local property owners/interested parties, most of whom were against the <br />proposal. <br />Comments made at these meetings are summarized as follows: <br />a. Concerns were expressed that the tower would negatively impact adjacent <br />property values. <br />56
The URL can be used to link to this page
Your browser does not support the video tag.