Browse
Search
BOA agenda 060815
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2015
>
BOA agenda 060815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 3:39:10 PM
Creation date
3/6/2018 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
6/8/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 060815
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities (continued) <br /> <br />Draft bond guaranteeing removal of <br />the wireless support structure in the <br />event that it is abandoned or <br />unused for a period of 12 months. <br /> <br />5.8.10 (B) <br />(3) (f) <br /> <br />Application (TAB 28), Applicant <br />Testimony. <br />Yes <br /> <br />A listing of, and current tax map <br />identifying, all property owners <br />within 1,000 feet of the parcel <br /> <br />5.8.10 (B) <br />(3) (g) <br /> <br />Application (TAB 5) Yes <br /> <br />A report containing any comments <br />received by the applicant in <br />response to the balloon test along <br />with color photographs from <br />various locations around the <br />balloon. <br /> <br />5.8.10 (B) <br />(3) (h) <br /> <br />Application (TAB(s) 22 and 29), <br />Applicant Testimony, Abstract. <br /> <br />Yes <br /> <br />Evidence that the balloon test <br />requirement has been met. <br /> <br />5.8.10 (B) <br />(3) (i) <br /> <br />Application (TAB 22), Abstract <br />(Attachment 2) <br /> <br />Yes <br /> <br />A notarized statement that the sign <br />posting requirement has been met. <br /> <br />5.8.10 (B) <br />(3) (j) <br />Staff testimony Yes <br /> <br />Photographs of a clearly visible <br />balloon floated at the proposed <br />tower location as well as <br />photographs with the proposed <br />tower and associated antennas <br />superimposed upon them showing <br />what the proposed tower will look <br />like. <br /> <br />5.8.10 (B) <br />(3) (k) <br /> <br />Application (TAB 22) Yes <br /> <br />The Special Use Permit application <br />shall include a statement that the <br />facility and its equipment will <br />comply with all federal, state and <br />local emission requirements. <br /> <br />5.8.10 (B) <br />(3) (l) <br /> <br />Application (TAB 6) and Applicant <br />Testimony <br />Yes <br /> <br />Environmental Assessment <br />Analysis and a Visual addendum. <br /> <br />5.8.10 (B) <br />(3) (m) <br /> <br />Environmental Assessment is not <br />required. <br /> <br />Application (TAB 22). <br /> <br /> <br />118
The URL can be used to link to this page
Your browser does not support the video tag.