Browse
Search
BOA agenda 060815
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2015
>
BOA agenda 060815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 3:39:10 PM
Creation date
3/6/2018 3:34:02 PM
Metadata
Fields
Template:
BOCC
Date
6/8/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
BOA minutes 060815
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Board of Adjustment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUIREMENT UDO SUPPORTING EVIDENCE Staff BOA <br />STANDARDS for Telecommunication Facilities (continued) <br /> <br />The make, model and <br />manufacturer of the tower and <br />antenna(s), antenna heights and <br />power levels of proposed site. <br /> <br />5.10.8 (A) <br />(1) (l) <br /> <br />Application (TAB 12), Applicant <br />Testimony <br />Yes <br /> <br />The frequency, modulation and <br />class of service of radio or other <br />transmitting equipment. <br /> <br />5.10.8 (A) <br />(1) (m) <br /> <br />Application (TAB 13), Applicant <br />Testimony <br />Yes <br /> <br />The maximum transmission power <br />capability of all radios, as designed, <br />if the applicant is a cellular facility. <br /> <br />5.10.8 (A) <br />(1) (n) <br /> <br />Application (TAB 14), Applicant <br />Testimony <br />Yes <br /> <br />The actual intended transmission <br />and the maximum effective <br />radiated power of the antenna(s). <br /> <br />5.10.8 (A) <br />(1) (o) <br /> <br />Application (TAB 15), Applicant <br />Testimony <br />Yes <br /> <br />The direction(s) of maximum lobes <br />and associated radiation of the <br />antenna(s). <br /> <br />5.10.8 (A) <br />(1) (p) <br /> <br />Application (TAB 16), Applicant <br />Testimony <br />Yes <br /> <br />Certification that the NIER levels at <br />the proposed site are within the <br />threshold levels adopted by the <br />FCC. <br /> <br />5.10.8 (A) <br />(1) (q) <br /> <br />Application (TAB 17), Applicant <br />Testimony <br />Yes <br /> <br />Certification that the proposed <br />antenna(s) will not cause <br />interference with other <br />telecommunications devices. <br /> <br />5.10.8 (A) <br />(1) (r) <br /> <br />Application (TAB 18), Applicant <br />Testimony <br />Yes <br /> <br />A written affidavit stating why "the <br />proposed site is necessary for their <br />communications service". <br /> <br />5.10.8 (A) <br />(1) (s) <br /> <br />Application (TAB(s) 19 and 26), <br />Applicant Testimony <br />Yes <br /> <br />A copy of the FCC license <br />applicable for the intended use of <br />the facility as well as a copy of the <br />5 and 10 year building out plan <br />required by the FCC. <br /> <br />5.10.8 (A) <br />(1) (t) <br /> <br />Application (TAB 20), Applicant <br />Testimony <br />Yes <br />116
The URL can be used to link to this page
Your browser does not support the video tag.