Browse
Search
BOA agenda 111212
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2012
>
BOA agenda 111212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 3:23:05 PM
Creation date
3/6/2018 3:11:00 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2012
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:1 <br />For purposes of this ordinance, steady -state vibrations <br />are v.'brations which are continuous, or vibrations in <br />discrete-impulses more frequent than sixty (60) per <br />minute. Discrete impulses which do not exceed sixty <br />(60) per minute, shall: be Considered impact vibrations. <br />b) The Rehabilitation Plan shall be referred to the orange <br />county soil and Water Con6ervation District for review and <br />recommendation, in particular regarding the landscape <br />material specified, the planting and maintenance proposed. to <br />.dasure ao'nt•S:riwou•s ,.anal. -the <br />acceptability of the proposals for the handling of lakes, <br />ponds, etc. <br />c) The permanent roads, defined as those to be used in excess of <br />one year, within the fill site shall be surfaced with a dust <br />free material, such as soil cement, bituminous concrete or <br />Portland Cement concrete. <br />d) Roads other than permanent roads shall be treated with dust <br />inhibitors, to be,specified in the operations Plan, which <br />will reduce to a minimum the generation of dust from the road <br />surfaces as a result of wind or vehicular action. Properly <br />operated water wagons.are an acceptable means of dust <br />inhibition. <br />e) Where the proposad fill shall take place within 300 feet of.,a <br />,dwelling, school, church, hospital, commercial or industrial <br />building, public building, or public land, a- security fence <br />at least six feet high shall be installed. <br />f) The Operations Plan and the Rehabilitation Flan shall be <br />coordinated so that the amount of disturbed land is kept to <br />the absolute minimum consonant with good practices and so <br />that rehabilitation proceeds in concert with filling. <br />*8.8.3 Public Utility Stations and Substations,, including electric <br />substations., metering, and switching stations receiving more <br />*Amended than 1.00 kilovolts kkv) -of electricity, Water Treat'rnent, <br />1--- 3--•89 Sewage Treatment Planter Telephone Exchanges Class A Special <br />Use). <br />8.8.3.1 Additional information r <br />la addition to the information required by Subsections 8.2 <br />and 8.8, the following shall be' submitted as part of the <br />applications <br />a) A Site Ulan showing all existing or proposed buildings, <br />storage areas, parking and access areas, topography at a <br />contour interval of five feet, any officially designated <br />floodplains or alluvial soils. <br />b) Plans and elevations for all proposed structures and <br />descriptions of the color and nature of all exterior <br />materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.