Orange County NC Website
DRAFT -6- <br />265 properties which are also shown on the plans we submitted. You can see a little detail as far as <br />266 who the owner is but I wanted to let you know what the uses were around the property. Number <br />267 one is Mr. Griffin's property, the barrier where the one is, is the barn. All the way around the <br />268 property except for number six are the same uses which are residential uses. Number six <br />269 would be the parkland that was alluded to earlier that the County has recently purchased for a <br />270 future park area. Number seven is the lot that the Purner's live on and in the lot connecting <br />271 expands to the rear of the property. This project is nestled in the woods in the evergreen <br />272 portion of the project to maintain the privacy and the surrounding sounds that exist now for <br />273 existing homeowners and landowners in that area. You also received a copy of this in the <br />274 original application packet. This is an elevation of what the Purner's and Schmidt's and our <br />275 architect .in our office, Brian Shelby, has come to an agreement as far as the concept on what <br />276 they would like the building to look like. Certain elements could change a little depending on the <br />277 final structural design, etc. but the concept is there. How the roof pitches, and I don't know a lot <br />278 about those details because I am not an architect, but I know that the Purner's and Schmidt's <br />279 have worked heavily with the architect and could probably answer any questions about that. It <br />280 will contain about nine kennels. Nine units are about 9,800 square feet with about 23 parking <br />281 spaces. Some will be equipped with fences in the rear as required by your ordinance at least <br />282 six feet high. Pools, exercise yards, solar panels and the twenty foot drive that will come onto <br />283 the existing easement that was granted for the use of this property. We will. also to have to <br />284 pretreat the pet waste before it goes to the conventional septic fields which I will talk about later. <br />285 The pet waste will be treated and then from there will go to the septic field. The system we <br />286 discussed, aimed in the stormwater treatment for the quality and quantity required by the <br />287 Orange County Stormwater division. This project airs on the side of low density so treatment of <br />288 stormwater will not be a problem. Are there any questions related to the site plan? <br />289 <br />290 As you saw on the site plans, there is a septic repair area that the kennel is centrally located on <br />291 the site to maintain the wooded area from there to Millhouse Road to help protect the adjacent <br />292 residencies. You can see there is a large fenced area for the exercise yard where the solar <br />293 panels will be located. It is also a pool there. Then you have the kennel which is not your <br />294 typical kennel where you have a metal building full of dog runs or cinder block buildings full of <br />295 dog runs. They have tried to be innovative. I am not an architect but I have been involved in <br />296 some of the conversations with the architect and he said it is one of the neatest projects he had <br />297 worked on to date. <br />298 <br />299 Bob Hornik: David Schmidt had talked a little about the green features of the design. Can you <br />300 tell us about those features and where they are located? <br />301 <br />302 Chad Abbott: The fenced in area will be here where there will be a row of solar panels in the <br />303 middle. That will be in the open area as a means to generate the electricity they are anticipating <br />304 as well as providing a shaded area for the dogs since you have a large exercise yard with no <br />305 real trees. Right now, we have not planned for the plumbing and where everything will be <br />306 located but there will be a cistern located to collect roof water and runoff used for washing down <br />307 the kennels. Those are the two items I know of and the design of the building has been done to <br />308 maximize the elements of natural sunlight. Those are the items I know of from the site plan <br />309 phase. Are there any questions regarding those items? <br />310 <br />311 Larry Wright: With respect to the solar panels and the exercise area, I know that a co- member <br />312 of the planning board has a variety of solar panels, I think 40, and that requires cables because <br />313 that is generally what they do and I was wondering how that will interface with the exercise area <br />314 and the safety of the dogs. <br />315 <br />316 David Schmidt: There are two envisioned arrays of photo cells. I think the picture shows along <br />317 the front of the building is one location and then the other is along the back. The cells <br />318 themselves would be raised on platforms. The platform is to provide shade because it gets hot <br />OC Board of Adjustment — 5114/2012 Page 6 of 41 <br />