Orange County NC Website
557 <br />permits. <br />A condition of approval is that <br />the applicant be required to <br />obtain a building permit within <br />one hundred eighty (180) days <br />from the issuance of the SUP <br />and that the building plans <br />have to be approved by the <br />Director of Animal Control <br />OC Board of Adjustment — 5/14/2012 Page 36 of 41 <br />DRAFT -36- <br />554 ARTICLE 5.6.5 - SPECIFIC STANDARDS FOR A CLASS II KENNEL <br />555 ( "Yes" indicates compliance; "No" <br />indicates non - compliance) <br />(continued) <br />556 <br />Section 5.6.5 (A) (2) (c) <br />x Yes No <br />The submitted site plan <br />x Yes No <br />(attachment 1) provides all <br />c) Any kennel which is not <br />essential information as <br />wholly enclosed within a <br />required. <br />building shall be enclosed by a <br />security fence at least 6 feet in <br />height, which shall include <br />primary enclosures or runs <br />Section 5.6.5 (A) (2) (d) <br />x Yes No <br />The submitted site plan <br />x Yes No <br />(attachment 1) provides all <br />d) The site plan shows parking, <br />essential information as <br />access areas and screening <br />required. <br />devices for buildings and animal <br />boarding facilities <br />Section 5.6.5 (A) (2) (e) <br />x Yes No <br />As detailed within Attachment <br />x Yes No <br />3, the site plan has been <br />e) The site plan shall be <br />tentatively reviewed and <br />reviewed by the Orange County <br />deemed appropriate by Animal <br />Animal Services Department, <br />Control. <br />and found in conformance with <br />the Animal Control Ordinance. <br />The applicant will be required <br />to apply for and obtain a permit <br />from Orange County Animal <br />Health in addition to the <br />Special Use Permit. <br />A condition of approval is that <br />the applicant be required to <br />obtain this permit within one <br />hundred eighty (180) days <br />from the issuance of the SUP <br />Section 5.6.5 (A) (2) (f) <br />x Yes No <br />The renderings. and floor plan <br />x Yes No <br />have been reviewed by Animal <br />f) Building plans for all kennel <br />Services. <br />facilities shall be reviewed and <br />approved by the Orange County <br />The applicant cannot make an <br />Animal Services Department <br />application for final approval <br />prior to issuance of any building <br />until the SUP is issued. <br />557 <br />permits. <br />A condition of approval is that <br />the applicant be required to <br />obtain a building permit within <br />one hundred eighty (180) days <br />from the issuance of the SUP <br />and that the building plans <br />have to be approved by the <br />Director of Animal Control <br />OC Board of Adjustment — 5/14/2012 Page 36 of 41 <br />