Orange County NC Website
547 <br />548 <br />NC DOT will need to review in <br />order to determine if a <br />driveway permit can be issued <br />allowing for the existing <br />driveway to be used to support <br />the hoarse boarding and <br />training facility. <br />They cannot issue final <br />approval until there is an <br />approved site plan. This <br />should be a condition of <br />approval. <br />OC Board of Adjustment — 5/14/2012 Page 34 of 41 <br />DRAFT -34- <br />1543 <br />1544 <br />ARTICLE 5.3.2 (B) - SPECIFIC STANDARDS /ALL SPECIAL USES <br />1545 <br />("Yes" indicates compliance; "No" <br />indicates non - compliance) <br />(continued) <br />1546 <br />Planning Staff <br />Recommending <br />EVIDENCE SUBMITTED <br />Board of Adjustment <br />FINDINGS <br />Findings: <br />TO SUPPORT FINDINGS <br />Findings: <br />Section 5.3.2 (B) requires the <br />applicant to address the <br />following: <br />1) Method and adequacy of <br />x Yes No <br />Information contained within <br />x Yes No <br />provision for sewage disposal <br />Attachment Three (3) of the <br />facilities, solid waste and water <br />abstract completed by staff <br />service. <br />indicate that the well and <br />septic system have been <br />approved by Orange County <br />Health <br />With respect to solid waste <br />disposal, the applicant has <br />indicated that he will contract <br />with a private firm for the <br />removal and disposal of waste. <br />According to staff this is <br />acceptable with respect to the <br />requirements of the UDO <br />2) Method and adequacy of <br />x Yes No <br />The New Hope Rural Fire <br />x Yes No <br />police, fire and rescue squad <br />Department will provide fire <br />protection. <br />protection. <br />Rescue services will be <br />provided by Orange County <br />EMS. <br />The Orange County Sheriffs <br />Department shall provide <br />police protection. <br />As detailed within Attachment <br />3 all applicable public safety <br />agencies have approved the <br />project <br />3) Method and adequacy of <br />x Yes No <br />The site plan indicates the lot <br />x Yes No <br />vehicle access to the site and <br />is accessed through an <br />traffic conditions around the site. <br />existing access easement onto <br />Millhouse Road. <br />547 <br />548 <br />NC DOT will need to review in <br />order to determine if a <br />driveway permit can be issued <br />allowing for the existing <br />driveway to be used to support <br />the hoarse boarding and <br />training facility. <br />They cannot issue final <br />approval until there is an <br />approved site plan. This <br />should be a condition of <br />approval. <br />OC Board of Adjustment — 5/14/2012 Page 34 of 41 <br />