Browse
Search
BOA agenda 111212
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2012
>
BOA agenda 111212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 3:23:05 PM
Creation date
3/6/2018 3:11:00 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2012
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT -22- <br />1126 want to on behalf... I think Claudia said it great and Kathy said it, we have all mustered together <br />1127 to protect this part of the northern Chapel Hill area from a lot of things. This is a beautiful <br />1128 building and I love all the green elements to it. I have to question, how much clearing there will <br />1129 have to be for the solar rays to get the maximum benefit facing south. There will not be a tree <br />1130 buffer there if the solar is going to work and we all know that is how solar works. I also want to <br />1.131 say the Schmidt's are very nice people I am sure and want to contribute but your dream does <br />1132 not necessarily match with my dream. You are bringing your dream to my neighborhood. My <br />1133 neighborhood is where I have lived for 15 years and want to continue living for a lot longer. This <br />1134 is a large building in a small area and it will have 10 employees, we understand, which hasn't <br />1.135 been mentioned. That is a business of sizable proportion. When we mention Spence's Farm <br />1136 and Emerson Waldorf School, they have both been there. Emerson Waldorf School has been <br />1137 there 25 years and Spence's Farm 30 years. Those are not like new intrusions into our <br />1138 neighborhood and I want Tammy and Drew to prosper and do what they want to do. I am just <br />1139 saying there are problems ahead. There are problems yet to discuss. I often run up and down <br />1140 Millhouse Road and I think Chad has, in all due respect, plans that don't show the topography. 1 <br />1141 wish before you make a decision that you could come to the site and actually understand the <br />1142 topographical issues we are talking about. It is not as flat and benign as it looks in plans. <br />1143 Please give it your best thought. <br />1144 <br />1145 Dawn Brezina: Any more testimony? <br />1146 <br />1147 Bob Hornik: Can we address some of the neighbor's issues? <br />1148 <br />1149 Dawn Brezina: Yes. <br />1150 <br />1151 Bob Hornik: I think Mr. Harvey has the receipt of having the receipt of sending the letter to Ms. <br />1152 Harris. <br />1153 <br />1.154 Robert Long: Our letter was delayed for a week and a half to two weeks and it finally got to the <br />:155 homeowner's association on Friday. <br />.156 <br />.157 Michael Harvey: They were stamped by the Hillsborough Post Office on the 27th of April. <br />.158 <br />.159 Bob Hornik: Perhaps Chad can talk to the board a little about Bruin Way and whether that was <br />.160 considered as a proposed access to the site. <br />.161 <br />.162 Chad Abbott: There were several issues brought up especially during the safety of the access. <br />.163 1 tried to go into as much detail as possible and I even showed pictures. Bruin Trail is located <br />.164 just around that curve so I don't see how anybody would deem that as a safe condition since <br />.165 there is already an access at that location that isn't safe so while it might be a benefit for Mr. <br />.166 Kirschner to not have the driveway at this location doesn't mean it is a safe location because it <br />.167 already exists, especially if you want to increase traffic in that location. The horizontal land, you <br />.168 can see on our site plan. You can see the curvature of the road. You can see that Bruin Trail is <br />.169 located at the top of the page and you are on the inside of this horizontal curve. You can see <br />.170 from the picture, you can see all the way back to the point but if you were here you would not be <br />.171 able to see to the point you can see... <br />.172 <br />.173 Mark Micol: Has that been brought up to the DOT? They recommend the use of ..... <br />.174 <br />.175 Chad Abbott: The Department of Transportation, we sent the plans to them, they had four <br />.176 comments. This pipe was shown here, it is not surveyed, just drawn in based on the concept <br />177 but the actual drainage pipe for the picture I showed is in the right of way. We will either replace <br />178 or maintain and extend that pipe. The other comment is that we provide the site... on the outer <br />OC Board of Adjustment — 5/14/2012 Page 22 of 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.