Browse
Search
OUTBoard agenda 111517
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 111517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 4:14:44 PM
Creation date
3/5/2018 3:51:27 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2017
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
OUTBoard minutes 111617
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Highways <br />Background <br />The highway and interchange projects to be included in the Preferred Option are shown in the <br />maps and tables below. Projects were selected based on their ability to promote the MPO's <br />draft Goals and Objectives and the expected availability of funding. <br />The MTP designates and funds the highway projects by the decade in which the project will be <br />completed for operation, i.e., current to 2025, 2026 to 2035 and 2036 to 2045. This <br />designation helps demonstrate that the MTP is accountable to the federal fiscal constraint <br />requirement. The North Carolina Strategic Transportation Investments (STI) funding tiers, i.e., <br />St = statewide, Reg = regional or Div = division, are identified to abide by the current state <br />funding process. <br />For the most part, new and upgraded interchanges are assumed to be part of the highway <br />projects that are listed and therefore are not commonly listed separately. However, the fiscal <br />year 2018 -2027 Transportation Improvement Program (TIP) has listed eight new or upgraded <br />interchanges as separate projects from the highway project. The 2045 MTP highway map and <br />table show these as separate projects, as well. <br />Highway Map <br />The highway map on the next page shows the proposed highway improvements for the 2045 <br />MTP. An interactive online map is also available at the Preferred tab on the 2045 MTP Web <br />page: www.bit.ly /DCHC -MTP <br />The DCHC MPO adopted a multimodal Comprehensive Transportation Plan (CTP) in May 2017, <br />which contains a larger set of proposed projects because the CTP is not fiscally- constrained. <br />See the interactive online map called Highways and Intersections at the following link to view <br />the CTP highways that were considered for possible inclusion in the 2045 MTP: <br />www. bit. IyJDCHCM PO- Adopted -CTP <br />Highway Table <br />The highway table breaks the projects into the three funding decades, i.e., 2025, 2035 and <br />2045, and then lists them alphabetically. <br />E.Q. <br />
The URL can be used to link to this page
Your browser does not support the video tag.