Browse
Search
OUTBoard agenda 111517
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 111517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 4:14:44 PM
Creation date
3/5/2018 3:51:27 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2017
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
Document Relationships
OUTBoard minutes 111617
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
548 <br />549 Heidi Perry said that she thought this explanation was very useful. <br />550 <br />551 Abigaile Pittman said that the OUTBoard will continue to get updates and continue to be asked to contribute because <br />552 this cycling process has many moving parts. Because we are still early in the process, the Calvander project could be <br />553 changed out because scoring had not started yet. Scoring starts on the state level, then regional projects and then <br />554 divisional items. <br />555 <br />556 8. CONSIDERATIONS OF ADDITIONS TO THE AGENDA <br />557 <br />558 Abigaile Pittman provided an update from Pat Wilson at NCDOT that the design for the fencing project on the Orange <br />559 Grove Rd. bridge over 1 -40 is complete. Bids are going out in October, construction is supposed to start in November <br />560 and the project is slated to be completed in December 2017. She said that NCDOT also provided an update that they <br />561 lowered the speed limit on Orange Grove Rd. from 45 miles per hour to 40 mph. The concept for additional signage, <br />562 warning lights, and pavement markings for pedestrians on the bridge has not yet been addressed. Discussions <br />563 around a sidewalk agreement between Orange County and Hillsborough are still ongoing. <br />564 Alex Castro asked if there is an existing easement along the Orange Grove Road. <br />565 <br />566 Abigaile Pittman said that there is not an existing sidewalk easement along Orange Grove Road; however, the <br />567 existing right -of -way from Grady Brown Road to Patriot's Point is being researched. <br />568 Heidi Perry commented that it would be a good thing to have a sidewalk agreement in place regardless of this <br />569 particular spot so they could use it when necessary. <br />570 <br />571 Abigaile Pittman said that sidewalk encroachment agreements are not County -wide but address a specific, defined <br />572 location. <br />573 <br />574 Brantley Wells said that he has some surveys on this area from a project done on the other side of the street. <br />575 <br />576 Abigaile Pittman said that sidewalks might not be possible along this section of the road due to lack of right -of -way, <br />577 funding; however, some safety improvements might be possible in the near future, such as as adding pavement at <br />578 the northwest corner of New Grady Brown and Orange Grove Church Road Where vehicles go off road. The buses <br />579 turning here get create a muddy rut. When it rains, school children go out in the middle of the street to avoid the mud. <br />580 Further improvements could include widening the shoulder and pavement on the north side of Grady Brown across <br />581 from the high school frontage; and to put a crosswalk between the schools. These additions would pair well with the <br />582 bridge safety project. Several of these improvements are included in the Safe Routes to School Plan. <br />583 Alex Castro stated that he sees the Safe Routes to School Plan recommended projects as a continuum to the <br />584 improvements on the Orange Grove Rd. bridge. <br />585 <br />586 MOTION made by Alex Castro that the OUTBoard endorse the recommended improvements included in the Safe <br />587 Routes to School Plan to be in coordination with the NCDOT planned resurfacing project for New Grady Brown Road, <br />588 and that this project schedule be advanced from 2020 to 2018. The Motion was second by Erle Smith. <br />589 VOTE: UNANIMOUS <br />590 <br />591 AGENDA ITEM 8: BOARD COMMENTS <br />592 <br />593 Heidi Perry said that she went to the BOCC meeting last night where they were discussing the Mountains to Sea Trail <br />594 plans She said that they opened -up a dialogue about how far behind Orange County's is with regard to greenway <br />595 construction, compared to Durham and Wake counties. <br />596 <br />597 AGENDA ITEM 9: ADJOURNMENT <br />598 <br />599 OUTBoard meeting was adjourned by consensus. <br />600 <br />601 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.