Orange County NC Website
1- 5967 - Interchange Improvements 1 -85 at South Churton St. -R /W FY 2022, Construction FY 2024 <br />U -5848- Extend Orange Grove Road from South Churton Street to US 70 A, R/W FY 2021, <br />Construction FY 2023 <br />U -5845 - South Churton Street from 1 -40 to Eno River, Widen to Multi- Lanes, R/W FY 2022, <br />Construction FY 2024 <br />P -5701- Hillsborough Passenger Rail Station- Construction FY 2021 <br />B -4962- Replace Bridge #46 over the Eno River R/W FY 2018, Construction FY 2019 <br />Notable Resurfacing Protects: <br />Recently Completed: <br />DG00319 — Widen and Resurface St. Mary's Road and Schley Road — Completed September <br />2017 <br />DG00360- Resurface US 70 from NC 86 to Durham County Line- Completed August 2017 <br />DG00331— Resurface 17 Sections of Secondary Roads and Widen and Resurface 4 sections of <br />Secondary Roads (incl. Hurdle Mills Road, McDade Store Road, Orange Clover- Garden Road and <br />Mattress Factory Road) — Completed September 2017 <br />Under Construction: <br />DG00371— Resurfacing of 9 roads in Orange County (Buckhorn Road, Shambley Road, Redman <br />Road, Mace Road, Lancaster Road, Paylor Street, Perry Road, Redman Crossing Road and Alpha <br />Drive) —Anticipated Completion November 2018 <br />Future Projects: <br />C204025 — Resurfacing 1- 40/1 -85 from NC 54 to Buckhorn Road — Anticipated Start TBD 2018, <br />Anticipated Completion TBD 2018 <br />DG00393 — Preservation (AST Seal) of 20 roads in Orange County — Anticipated Start April 2018, <br />Anticipated Completion October 2018 <br />Under Development: <br />North Churton Street from NC 86 to US 70A- Construction Summer 2018 <br />South Churton Street /Old NC 86 - 2018/2019 <br />US 70/1 -85 Connector- 2018/2019 <br />Buckhorn Road - 2018/2019 <br />US 70 West- 2019/2020 <br />47 <br />