Orange County NC Website
developed based on this scoring methodology, but before the RTCC and RTAC vote on the <br />assignment of points. Any comments provided by the public will be reviewed by the RTCC and <br />RTAC before the vote on the assignment of points and those discussions will be documented in <br />the meeting minutes. <br />Proposed Schedule for Implementation of Policy in Prioritization 5.0 <br />RTCC & RTAC adoption of project list to submit to NCDOT — occurred on August 17, 2017 <br />Adoption of this policy — February 8, 2018 (with public hearing at beginning of RTAC meeting) <br />NCDOT provides quantitative scoring information to TARPO — end of March 2018 (this <br />information will be posted on the TARPO website once available) <br />Each county, working jointly with its municipalities, approves a ranked list of its top ten projects <br />and submits this list to TARPO — April /early May 2018 (due to TARPO no later than May 15, <br />2018; this information will be posted on the TARPO website once available) <br />TARPO staff calculates scores for local point assignment and posts the scores and draft <br />recommended point assignments on the TARPO website — late May 2018 <br />Public workshop(s) to present local point assignments and gather input — late May /early June <br />2018 <br />RTCC & RTAC adoption of Regional Impact category local point assignments — June 14, 2018 <br />(final point assignments will be posted on the TARPO website following meeting) <br />RTCC & RTAC adoption of Division Needs category local point assignments — October 11, 2018 <br />(final point assignments will be posted on the TARPO website following meeting) <br />NCDOT releases Draft Statewide Transportation Improvement Program (STIP) — January 2019 <br />(this information will be posted on the TARPO website once available) <br />A motion was made by and seconded by <br />adoption of this policy, and upon being put to a vote it was duly adopted on <br />Chair, Triangle Area RPO RTAC Secretary, Triangle Area RPO RTAC <br />for the <br />TARPO1/2/2018 Draft Prioritization 5.0 Local Point Methodology for Triangle Area RPO — Page 7 <br />