Browse
Search
OUTBoard agenda 011718
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2018
>
OUTBoard agenda 011718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 3:33:14 PM
Creation date
3/5/2018 3:30:51 PM
Metadata
Fields
Template:
BOCC
Date
1/17/2018
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deviations from Methodology <br />These recommended point assignments will be presented to the RTCC and RTAC for their <br />review and approval. The RTCC retains the discretion to make recommendations to the RTAC <br />regarding changes to the list. The RTAC has the final discretion regarding assignment of local <br />points, and retains the flexibility to make changes to these point assignments if it is able to <br />document a reason for doing so. These changes must be documented and made available to <br />the public via the TARPO website. <br />Cascading Projects <br />TARPO will submit its Regional Impact local point assignments separately from its Division <br />Needs local point assignments, and will be able to learn which projects are funded in the <br />Regional Impact category before assigning points in the Division Needs category. As a result, if <br />there are projects funded in the Regional Impact category that would otherwise be in line to <br />receive Division Needs points as a result of this methodology, those Division Needs points will <br />instead be assigned to the next - highest scoring eligible project that has not received points <br />(subject to the rules requiring that at least two projects from each county receive points). This <br />process will be clearly explained as part of the public outreach process, and the list of "next in <br />line" projects that could potentially be affected by this rule will be presented at the same time the <br />initial point assignment recommendations are presented. <br />Point Sharing <br />On projects that cross outside of the TARPO planning boundary, TARPO must coordinate with <br />its neighboring organizations on the allocation of points. By right, TARPO may only assign the <br />number of points equal to the percentage of the project that is located within the TARPO <br />boundary —for example, TARPO could assign a project that was 48% located within its <br />boundary only 48 points by right. However, TARPO will coordinate with its neighboring <br />organizations to "share" points to ensure that these projects reach a point total of 100 points —in <br />the example above, TARPO would share 52 points with its neighbors to ensure the project <br />receives 100 points. In the event that point sharing is not necessary on these projects, either <br />because the neighboring organization already plans to assign its full amount of points for the <br />project or because the neighboring organization rejects TARPO's offer to share points, TARPO <br />will only assign the points for the portion within its boundary and the remaining points will be <br />allocated to the next - highest scoring project on the project list that did not already receive full <br />points. <br />z'l ri c i 111 t,l 11 11 it C 0 t,u lk. °ezi l <br />� .t M z'l 1 i " "I'll 111 : <br />
The URL can be used to link to this page
Your browser does not support the video tag.