Browse
Search
OUTBoard agenda 011718
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2018
>
OUTBoard agenda 011718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 3:33:14 PM
Creation date
3/5/2018 3:30:51 PM
Metadata
Fields
Template:
BOCC
Date
1/17/2018
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: TARPO is located in Divisions 7 and 8, both of which use the same "alternative" scoring <br />criteria that differ from NCDOT's standard scoring criteria for the highway mode in the Division <br />Needs category. These alternative criteria will also be used for TARPO's scoring of projects. <br />11 °cfl R 11 1 (..,, z I rl d 11 l l o j ect 11 k zl l de", i1 Ik iK a A 1p) ll) ir'o zi c�1 i° 111 o i in t A s s i a In r n e In <br />Once all projects in each mode have been scored according to the criteria above, TARPO staff <br />will develop a ranked list of projects within each county and within the region as a whole based <br />on the outcome of the scoring. This ranked list of all projects in all modes will be used to <br />develop the recommended point assignments that are presented to the public for comment and <br />to the RTCC and RTAC for approval. There will be separate rankings for the Regional Impact <br />category and the Division Needs category. <br />The recommendation will call for the two top- scoring projects within each county (regardless of <br />mode) to be allocated 100 points each. Additionally, the six next - highest scoring projects within <br />the region (regardless of county and mode) will also be allocated 100 points each, to reach <br />TARPO's total point allocation of 1400 points. In the event that a county does not have at least <br />two eligible projects, then additional projects will be selected from the top of the list of remaining <br />projects in the other counties. This allows for geographic equity of projects in the region. <br />No projects with a DOT quantitative score less than 10 will be recommended for points. <br />Any project that local jurisdictions specifically request not be assigned points during the <br />countywide project ranking process will not be recommended for points. <br />An example of the ranking process is shown on the next page. <br />TARPO1/2/2018 Draft Prioritization 5.0 Local Point Methodology for Triangle Area RPO — Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.