Orange County NC Website
• Coordination with the Division Engineers and neighboring MPOs and RPOs on the <br />assignment of points; <br />• Public input and support as evidenced through public comments submitted to the MPO, the <br />MPO's public hearing, public involvement efforts of local governments, and local referenda; <br />• The MPO Board members' knowledge of the urban area and the policies of their <br />communities; and <br />• Other factors as identified. If the MPO Board varies from the recommended allocation of <br />points, MPO staff will document the rationale and will post the documentation on the MPO's <br />website. <br />Attachment 2 - DCHC MPO process - provides additional details. <br />B -G MPO Local Input Point Process <br />The Burlington- Graham MPO is allocated a total of 1,300 points to allocate to each Region and <br />Division project. The final point assignment will be made by the BGMPO Technical Advisory <br />Committee (TAC) after public review and recommendation by the Technical Coordinating <br />Committee (TCC). The TAC will consider projects for local input point assignment based on <br />the following criteria- <br />1 . Prioritization scoring results — Candidate projects will be rank ordered based on their <br />respective NCDOT prioritization scoring results. <br />2. Consistency with local and regional plans — Candidate projects must be consistent and <br />included within locally adopted comprehensive plans and the adopted Comprehensive <br />Transportation Plan (CTP) and the Metropolitan Transportation Plan (MTP). <br />3. Public Involvement — Consideration of public comments by the TAC before assigning local <br />input points to the rank ordered project list. <br />4. Point Assignment — The TAC will assign the maximum 100 points to the top ranked <br />projects. <br />Per the NCDOT and STI regulations, 1,300 points is available to assign to Region level <br />projects and Division level projects. <br />The TAC may exercise its option of sharing or allocating unassigned local input points to <br />increase the "scoring" of regional transportation projects (regional being more than one county) <br />with an adjacent MPO. This process is accomplished via an informal agreement between the <br />MPOs and notification to NCDOT. <br />The ranked list of the highest scoring projects will be submitted to NCDOT for further <br />evaluation. Final project submittal will also occur via online process with NCDOT. <br />Attachment 3 — B -G MPO process - provides additional details. <br />FINANCIAL IMPACT: There is no immediate financial impact associated with this item. <br />RECOMMENDATION(S): Staff recommends that the OUTBoard: <br />1. Receive the update: and <br />2. Discuss as appropriate and provide any input that the Board might have for internal <br />Staff consideration <br />22 <br />