Orange County NC Website
12 <br /> Uses/Activities: Allowable: Allowable with <br /> Mitigation: <br /> 1 Proposal would not disturb over forty (40) <br /> linear feet of riparian buffer. X <br /> 2 Proposal would disturb over forty (40) linear <br /> feet of riparian buffer. Under no X <br /> circumstances may a street or road require <br /> the disturbance of over one hundred fifty <br /> (150) linear feet of riparian buffer <br /> Temporary roads intended to allow access to a X <br /> property for development purposes. <br /> Railroad crossings and right-of-ways crossing of streams and ofher s urface waters as <br />follows: <br />1 Railroad crossings that impact less than, or <br />equal to forty (40) linear feet of riparian X <br />buffer <br />2 Railroad crossings that impact more than <br />forty (40) linear feet of riparian buffer. <br />Under no circumstances may a railroad X <br />crossing or railroad line require the <br />disturbance of over one hundred fifty (150) <br />linear feet of riparian buffer <br />Scientific studies and stream aauging X <br />Stormwater management ponds-excluding dry ponds as follows: <br />1 New stormwater management ponds <br />provided that a riparian buffer that meets <br />the requirements of the Orange County X <br />Stormwater Ordinance and Zaning <br />Ordinance and is established adjacent to <br />the pond. <br />2 New stormwater management ponds where <br />a riparian buffer that meets the X <br />requirements of the Orange County <br />Stormwater Ordinance and Zoning <br />Ordinance and is NOT established adjacent <br />to the pond <br />A- 12 <br />