Orange County NC Website
Watershed Critical Area Mapping Options 5 <br />11/14/2006 <br />Assumptions for 1. The 1984 West Orange Study citing groundwater <br />Options 1,2. "interflow" is not being considered <br />2. 1987 Water Supply Study for proposed impoundments of <br />the Eno River above McGowan Creek and Seven Mile <br />Creek is the basis for the critical area and watershed <br />delineations. <br />3. The BOCC wanted to buffer the river channel above the <br />Eno River above McGowan Creek Reservoir and the area <br />between Seven Mile Creek Dam and Lake Ben Johnston, <br />which was not listed in the Zoning Ordinance text. <br />4. The `stream order' system of stream classification is not <br />considered is not considered to capture higher order <br />streams flowing into existing or proposed impoundments <br />or public water supply intakes. <br />UT o;nprebewiM Planuhip, Pi "G.I.'s \i';`.2iH;G Public t tearhg,, N,,V 20 QPI P.i ;tiler F no Text Anufuc' :tylapping Option C, ±mpari,ons.dra: <br />